Non-Corrigé Traduction
Uncorrected Translation
AU
CR 2009/21 (traduction)
CR 2009/21 (translation)
Mardi 29 septembre 2009 à 10 heures
Tuesday 29 September 2009 at 10 a.m.] - 2 -
12 The VICE-PRESIDENT, Acting President: Please be seated. The sitting is open and I give
the floor to Professor Philippe Sands. Vous avez la parole, M. le professeur.
M. SANDS :
V. V IOLATION DES ARTICLES 36 ET 41 DU STATUT :ELEMENTS DE PREUVE ,DOMMAGES
CAUSES A L ’ECOSYSTEME ET A L ’ENVIRONNEMENT
I. Introduction
1. Je vous remercie, Monsieur le président. Monsieur le président, Messieurs de la Cour,
M.Wheater et M.Colombo vous ont parlé hier des preuves décisives des modifications de
l’équilibre écologique et des dommages causés à l’ environnement du fleuve Uruguay par les rejets
de l’usine Botnia. Je vais vous parler aujourd’ hui, après m’être plongé toute la nuit dans des
données brutes, des conséquences juridiques qu’il faut tirer de ces preuves, et des normes
juridiques que selon nous l’Uruguay est tenu de respect er en application du statut. Et je vais le
faire eu égard à deux questions essentielles. Premièrement, la question de l’ inversion du courant :
est-ce que ceux qui ont pris, en Uruguay, la décision d’autoriser l’usine connaissaient le
phénomène d’inversion du courant et son ampleur et, dans l’affirmative, en ont-ils adéquatement
tenu compte lorsqu’ils ont pris leurs décisi ons? Et, deuxièmement, la question de la pollution :
l’usine Botnia a-t-elle causé une pollution ou une modification de l’équilibre écologique
dommageable, par exemple en contribuant à des vi olations des normes de la CARU ou d’autres
normes, voire au regard d’autres critères? A cet égard, la relation entre l’usine Botnia et la
prolifération d’algues sans précédent de février s’est révélée être la question de fait qui divise les
Parties. Et en traitant de ces deux questions, je vais aussi essayer de répondre à l’importante
question du juge Bennouna.
2. Mais avant d’aborder ces questions, je voudrais faire quelques observations préliminaires.
3. Premièrement, nous ne voyons pas la néces sité de passer davantage de temps sur ce que
signifient ou ne signifient pas les articles premier, 36 et 41. Les Parties ont longuement plaidé sur
ces questions. L’interprétation de M.Boyle n’était pas persuasive, et il s’est fréquemment écarté
du texte effectif des dispositions pour étayer ses interprétations assez étroites. Vous vous
souviendrez, par exemple, qu’il a décrit comme «a udacieuse» l’interprétation de l’Argentine selon - 3 -
laquelle l’article36 oblige l’Uruguay à éviter «t out changement dans l’équilibre écologique» 1.
Ceci est curieux, parce que l’Argentine ne faisait qu’utiliser les termes mêmes de l’article36, qui
13 oblige bien les parties à éviter « [toute] modification écologique» (en anglais « any ecological
change»; il ne dit pas «modification écologique importante» ni «modification écologique
dommageable», mais bien « toute modification écologique». Tels sont les termes dont les Parties
sont convenues et tels sont les termes que la Cour do it interpréter et appliquer ⎯ «toute» signifie
«toute».
4. Deuxième observation préliminaire: il est ma intenant clair que les Parties sont un peu
comme des navires se croisant dans la nuit, ell es ont des approches assez différentes du centre de
gravité de la présente affaire. Une grande partie de l’argumentation de l’Uruguay est axée sur la
splendeur technologique de l’usine, qui serait l’une des plus modernes de la planète. Ceci est
peut-être vrai ou n’est peut-être pas vrai. Mais là n’est pas la question. La question clé n’est pas
l’usine ni sa technologie, mais bien le fleuve: ce fleuve peut-il recevoir cette quantité de rejets à
cet endroit? Les divergences entre les Parties sont illustrées par les experts extérieurs auxquels
elles font appel: l’Uruguay a fait déposer un spécialiste des questions technologiques mais
personne qui soit spécialiste des fleuves. Et vous aurez remarqué également qu’aucun scientifique
ne s’est adressé à la Cour au nom de l’Uruguay. Pour une affaire de cette espèce, qu’elle soit jugée
par la Cour ou par tout autre tribunal internationa l, je n’ai connaissance d’aucun autre Etat ayant
adopté une approche aussi minimaliste s’agissant du jugement d’une affaire qui présente certains
aspects techniques et scientifiques complexes. Par contre, nous avons quant à nous fait déposer des
spécialistes du fleuve. Pour l’Argentine, il ne s’agit pas dans cette affaire d’aménagements
technologiques, mais de la nature du fleuve: nous disons qu’il ne devrait pas y avoir d’usine de
pâte à papier à cet endroit précis. Il ne vous est pas demandé de statuer sur les mérites ou les
inconvénients de telle ou telle technologie utilisée dans cette usine.
5. Ceci ne signifie toutefois pas que la qu estion des normes juridiques applicables n’est pas
pertinente. Elle l’est, et ceci m’amène à une troisième observation préliminaire: l’Uruguay a
modifié son argumentation en ce qui concerne le droit appli cable. Vous vous souviendrez de la
1
CR 2009/18, p. 22, par. 35. - 4 -
thèse que l’Uruguay a défendue il y a troisans: au stade des mesures conservatoires, l’Uruguay
vous a dit qu’il imposait à Botnia «l’obligation de se conformer aux normes MTD européennes» 2.
Les émissions de l’usine Botnia, vous a dit M. Reichler, et je cite de nouveau, «répondront aux
critères très stricts appliqués en Europe» 3. L’Uruguay ne vous a rien dit de plus sur ce sujet la
semaine dernière. Cette prétention a été aba ndonnée, l’Uruguay reconnaissant que l’usine Botnia
rejette des effluents d’une manière qui viole manifestement les normes de l’Union européenne
relatives à la qualité de l’eau et qu’elle re jette ou a rejeté des substances interdites ⎯ dont des
nonylphénols ⎯ interdites par l’Union européenne. Il semblerait que les conseils de l’Uruguay se
14
soient aperçus qu’ils étaient allés trop loin la dernière fois, et ils ont donc fait marche arrière. Leur
manque d’informations sur ce que rejette ou a rejeté l’usine les a amenés à plus de prudence, en
certaines occasions. Mais la prétention invoquant les normes de l’Union européenne n’est pas de
celles qu’il est loisible à l’Uruguay d’abandonne r: l’Uruguay a déclaré qu’il appliquerait les
normes de l’Union européenne et d’autres ⎯ l’Argentine, la SFI, la Cour ⎯ ont fait fond sur cette
déclaration, qui n’a pas été faite seulement dans cette salle d’audience. Vous avez dans votre
dossier divers exemples d’engagements pris ailleurs d’appliquer le droit de l’Union européenne.
En novembre2007, par exemple, lorsque l’usine Botnia a été mise en service, le président et
directeur général de Botnia, M.ErkkiVaris, a déclaré: l’usine «fonctionnera conformément aux
4
normes les plus strictes énoncées par l’Union européenne» . On peut démontrer que cette
affirmation est fausse. En juille t 2009, lorsqu’UPM est devenu propr iétaire de l’usine Botnia, il a
publié un communiqué de presse indiquant que «l’u sine fonctionne conformément aux normes les
plus strictes énoncées par l’Union européenne» 5. On peut démontrer que cette affirmation
également est fausse. Un engagement comparable a aussi été pris vis-à-vis de la SFI qui, comme
l’indique clairement son site Inte rnet, a agi en conséquence. Vous trouverez également sur ce site
Internet la déclaration suivante: «l’usine satisfera également…aux normes de l’Union
2 CR 2009/12, p. 49, par. 26 (Sands, renvoyant au CR 2006/47, p. 27 (Boyle)).
3
Ibid., p. 53.
4 RA, annexe, vol. III, annexe 51.
5 Disponible à l’adresse http://w3.upm-kymmene.com/upm/internet/cms/upmcms.nsf/prv/upm_and_Mets%…
%A4litto_sign_a_letter_of_intent_on_new_ownership_structure_of Botnia. - 5 -
européenne» [traduction du Greffe] . Mais peut-être vous demandez-vous pourquoi les conseils de
l’Argentine font si grand cas de ce point? La répo nse est très simple: si Botnia, l’Uruguay et la
SFI invoquent les normes de l’Union européenne , l’Argentine est habilitée à invoquer les normes
de l’Union européenne et la Cour a le droit d’exiger de l’Uruguay qu’il respecte ces mêmes normes
de l’Union européenne, en sus des normes de la CARU et autres normes internationales
applicables. M. le président, la Cour a, en 1974, confirmé dans l’arrêt qu’ elle a rendu en l’affaire
des Essais nucléaires, que «des déclarations revêtant la forme d’actes unilatéraux et concernant des
situations de droit ou de fait peuvent pour effet de créer des obligations juridiques» ( Essais
nucléaires (Nouvelle-Zélande c.France), arrêt, C.I.J.Recueil1974 , p.472, par.46), et qu’un
engagement pris publiquement avec l’intention de se lier lie son auteur. L’Uruguay a pris son
engagement publiquement et très officiellement, dans cette salle d’audience même. Ses conseils
n’ont laissé aucun doute quant à l’intention de l’Uruguay d’être lié par cet engagement. L’Uruguay
15 ne peut aujourd’hui revenir sur un engagement qui l’embarrasse, pas plus qu’il ne lui est loisible de
revenir, au moins sans qu’il lui en coûte, sur ses écritures antérieures sur les questions de fait.
6. Et ce n’était pas le seul point sur lequel l’Uruguay a modifié sa position la semaine
dernière. Il est maintenant apparent, et c’est ma quatrième observation préliminaire, que l’Uruguay
a complètement modifié sa thèse quant aux faits. Il a modifié sa position sur l’inversion du
courant, par exemple. J’y reviendrai. Il a modifié sa position sur l’impact de polluants. Par
exemple, il admet aujourd’hui que l’Esteros de Fa rrapos, un site de terre s humides protégé par la
convention Ramsar, peut être affecté par les reje ts de l’usine Botnia. «[M]alheureusement», a
déclaré le conseil de l’Uruguay à la Cour lundi dernier, «je ne disposais pas de cette information et
7
je n’ai donc pas pu la communiquer à la Cour en 2006» . Mais quand le conseil de l’Uruguay dit
«cette information», de quoi parle-t-il ? Il ne peut pas viser l’emplacement du site Ramsar. Il ne
peut pas parler du fait que ce site est relié au fleuve. Il vise l’inversion du courant, une
caractéristique du fleuve que lui et tous les autr es conseils de l’Uruguay ne connaissaient pas,
semble-t-il, en 2006.
6
Voir http://www.ifc.org/ifcext/lac.nsf/content/Uruguay_Pulpmills_FAQs.
7
CR 2009/16, p. 37, par. 66 (Boyle). - 6 -
II. L’inversion du courant
7. Et ceci nous amène à l’inversion du cour ant. Les Parties s’accordent maintenant à
considérer qu’il s’agit d’une question clé parce qu’elle affecte la capacité du fleuve de disperser les
effluents. Ainsi, la Cour a deux questions de fa it à trancher : premièrement, ceux qui ont autorisé
l’usine et son financement connaissaient-ils les phénomènes d’inversion du courant et de stagnation
et leur ampleur ⎯ les connaissaient-ils ? Deuxièmement, ont- ils tenu compte de tous les effets de
8
l’inversion du courant ? M. Reichler a traité très longuement de ces questions . Sa plaidoirie de la
semaine dernière reposait sur la proposition selon laquelle les éléments de preuve attestaient que
l’Uruguay, et je le cite, «a postu lé que le courant du fleuve s’i nversait sensiblement plus souvent
9
que ne l’a fait l’Argentine: 29% contre23%» . En cette occasion, bien sûr, nous sommes
heureux de jouer au jeu des chiffres avec l’Uruguay, et je dois vous dire que cette affirmation a
extrêmement surpris l’Argentine. Elle traduit une volte-face dans la position de l’Uruguay. C’est
important. Passons lentement en revue les éléments pertinents.
16 8. Nous pouvons commencer par ce que l’Urugua y a dit qu’il savait. Nous avons parcouru
les principales écritures ⎯ et à notre connaissance nulle part l’Uruguay n’affirme avoir argué qu’il
avait fait fond sur un taux d’inve rsion du courant de 29 %, ou de fait, sur un taux élevé quel qu’il
soit. En fait, ce chiffre de 29 % provient d’un do cument enfoui dans l’annexe R11 de la duplique
10
de l’Uruguay et il n’est mentionné nulle part ailleurs. Ce document a été établi par la DINAMA
en réponse à des préoccupations exprimées par l’Arge ntine au sujet du phosphore. Il n’explique
aucunement comment on est parvenu à ce chiffre, qui semble provenir du modèle établi aux fins de
11
l’étude d’impact sur l’environnement de Botnia , un modèle dont M.Wheater a expliqué hier
(CR 2009/20) qu’il était grossièrement inadéquat, parce que reposant sur des données insuffisantes
et utilisant un modèle bidimensionnel inapproprié pour rendre compte du pr oblème de l’inversion
du courant. Mais, quel que soit son origine ⎯nous n’avons pas été en mesure de la déterminer
exactement ⎯ le point crucial est qu’il établit ⎯c’est le point crucial ⎯ qu’en décembre2005,
lorsque l’information a été donnée à l’ Argentine, les autorités uruguayennes ⎯ ou au moins
8CR 2009/16, p. 41-46, par. 8-22.
9
Ibid., p. 46, par. 20.
10DU, vol. II, annexe R11, p. 2, par. 5.
11Annexe VIII du rapport additionnel n 5 de l’EIA de Botnia, CMU, annexe 164. - 7 -
certaines autorités uruguayennes ⎯ avaient reçu des informations au sujet d’un taux très élevé
d’inversion du courant. Ceci était bien entendu avant la phase des mesure s conservatoires. La
confirmation que donne maintenant M.Reichler est d’une très grande importance: elle confirme
que l’Uruguay avait déjà connaissance de l’ampleur de l’inversion du courant. La question cruciale
devient alors la suivante : ont-ils alors fait fond sur ce chiffre de 29 % ?
9. Il est absolument manifeste qu’ils ne l’ ont pas fait. Commençons par ce que l’Uruguay a
dit dans ses écritures en la présente instance. Il n’indique absolument pas que les décisions ont été
prises sur la base de ce taux élevé donc prudent d’inversion du courant dont M. Reichler voudrait
maintenant vous faire croire qu’il a été tenu compte pour prendre les décisions en cause. Dans le
contre-mémoire, par exemple, on ne trouve aucun développement sur ce chiffre ou ses implications
pour l’évaluation de l’impact de l’usineBotnia. Nous trouvons ⎯et M.Reichler vous en a parlé
hier ⎯ des références à «l’éventualité, rare, d’une inve rsion de flux» au paragraphe4.122, à des
débits faibles, «des scénarios inhabituels, «les plus défavorables»» et «un événement rare et de
courte durée» ou, au paragraphe 5.64, aux inversions de courant comme devant se produire «tout au
plus quelques fois par année». Puis, au paragra phe6.76, l’Uruguay déclare que les éléments de
preuve de l’Argentine «exagère[nt] la fréquence du phénomène d’inversion». Je pourrais continuer
ad nauseam mais je n’en ferai rien. La duplique fa it exactement la même chose. La duplique
17 dénigre le travail fait par M. Rabinovitch sur l’i nversion du courant et indi que que «la plupart des
inversions sont indéniablement bien moins extrêmes et plus courtes» que ne l’affirment les experts
argentins12. Jusqu’à lundi dernier ⎯ jusqu’à lundi dernier ⎯ toute la thèse de l’Uruguay reposait
sur le fait que les éléments de preuve argentin s relatifs à l’inversion du courant étaient tout
simplement infondés et que tous les effluents étaient évacués rapidement et efficacement vers
l’aval. L’Uruguay a maintenant modifié sa position et admet que nos preuves relatives à
l’inversion du courant sont valides. La Cour aura remarqué que l’Uruguay n’a pas contesté
l’exactitude des croquis relatifs à l’inversion du cour ant que l’Argentine a produits le 30 juin 2009.
Et, à l’évidence, il ne peut le faire. Ces croquis reposent sur des donn ées réelles, des mesures
réelles. L’Uruguay n’a pas quant à lui de mesure s sur lesquelles s’appuyer et c’est peut être
12
DU, par. 6.20. - 8 -
pourquoi nous avons connu diverses difficultés pr océdurales. L’Uruguay ne connaît pas ou ne
comprend pas les données brutes. Tout ce dont il dispose pour FrayBentos est constitué par les
mesures effectuées pour la seule journée du 16déce mbre2003, et j’en ai parlé durant le premier
13
tour de plaidoiries . L’Uruguay n’a pas de données. Puisqu’il admet maintenant que nos données
sont exactes, il n’y a plus de différend entre les Parties sur cette question de fait essentielle et ceci
facilite beaucoup la tâche de la Cour.
10. La conséquence de cette admission, que nous sommes heureux d’accepter, est que
M. Reichler et son équipe sont maintenant confrontés à des très grosses difficultés. Ils sont dans la
position malencontreuse d’avoir à faire un choix impossible. M. Reichler aurait pu s’en tenir à sa
position précédente selon laquelle l’Uruguay se trompa it sur l’inversion de courant mais, bien
entendu, il savait qu’il perdrait cette bataille et avec elle le principal soutien de sa thèse:
l’Argentine pourrait alors facilement montrer que les autorisations de l’Uruguay, et les actions de la
SFI, étaient fondées sur des hypothèses manifestement erronées quant à la capacité du fleuve de
disperser les effluents. Il a donc choisi la seule voie qui lui était ouverte : il a écarté l’ensemble des
écritures de sa partie et admis que l’Argentine avait raison au sujet de l’inversion du courant. Il lui
faut maintenant persuader la Cour que, contrairement à ce qu’il affirmait précédemment, toutes les
décisions de l’Uruguay, ainsi que celles de la SFI , ont été prises en postulant que l’inversion du
courant était d’une plus grande ampleur encore que l’Argentine ne le dit. Ceci a mené l’Uruguay
au bord d’un précipice et à deux doigts d’une catastr ophe. Si M. Reichler ne peut vous persuader
que ces décisions ont été prises sur le fondement d’une appréciation exacte de l’ampleur de
18 l’inversion du courant, il se trouvera, de même que l’Uruguay, dans la situation suivante : il devra
établir que l’Uruguay avait connaissance du phénomène d’inversion du couran t depuis le début et
qu’il n’a ⎯ délibérément semble-t-il ⎯ tenu compte ni de son ampleur ni de son effet, ni de ses
conséquences pour le projet. Ceci, Monsieur le pr ésident, serait très grave. Mais il semble, au vu
du dossier, que c’est bien ce qui s’est passé.
11. M.Reichler voudrait vous faire croire que les décisions importantes n’ont commencé à
14
être prises qu’en janvier 2006 . Ce n’est pas un lapsus de sa part. Il lui faut repousser la date de
13
CR 2009/14, p. 61, par. 12.
14
CR 2009/16, p. 43, par. 5. - 9 -
l’autorisation pour étayer ses autres arguments, à savoir que d’une manière ou d’une autre,
l’Argentine avait auparavant accepté un projet ⎯ce que bien entendu elle n’a jamais fait ⎯ et
pour étoffer le dossier des évaluations d’impact sur l’environnement sur lesquelles il voudrait
pouvoir arguer que les décisions ont été fondées. En fait, l’acte d’autorisation a eu lieu
le14février2005, lorsque le ministère du loge ment, de l’aménagement du territoire et de
l’environnement uruguayen a accordé à Botnia son autorisation environnementale préalable [AAP],
15
après quoi les travaux ont commencé sur le site . A de nombreux égards, il s’agissait de la plus
importante de toutes les décisions, parce qu’elle approuvait l’emplacement choisi pour l’usine et
autorisait le transfert des fonds nécessaires en Uruguay. Si des informations exactes sur l’inversion
du courant étaient cruciales à un moment donné, c’est bien avant que le site ne soit choisi. Cette
décision a-t-elle donc été fondée sur des hypothèses fixant à 29 % ou 23 % le taux d’inversion du
courant? Elle ne l’a pas ét é. La décision de février2005 ⎯ l’autorisation environnementale
préalable ⎯ reposait sur deux documents : l’évaluation de l’impact sur l’environnement de Botnia
16
du 31 mars 2004, accompagnée de certains rapports additionnels , et l’évaluation de la DINAMA
du 11février2005. L’évaluation de l’impact su r l’environnement de Botnia n’examine pas les
17
implications d’un taux élev é d’inversion du courant . Elle vise les bas débits qui, indique-t-elle,
ont une «fréquence annuelle inférieure à10%». L’évaluation de la DINAMA de février2005, il
est vrai, mentionne bien l’inversion du courant mais juste en passant, comme ayant été observée en
tant que phénomène «à court terme» et «durant moins d’une journée». La DINAMA n’y voit pas
un problème grave, elle ne tire pas de conséquenc es de ses observations, et aucun chiffre n’est
mentionné quant à la fréquence du phénomène 18. Dans aucune évaluation postérieure les autorités
19 uruguayennes ne donnent effet aux conséquences d’une inversion du c ourant dont la fréquence
serait de 23 % ou 29 %, ou qui s’en approcherait.
12. Passons sur le processus officiel de prise de décisions. Je dis officiel parce qu’il est
maintenant manifeste pour nous que la décision de construire l’usine sur le site choisi a été prise
15Résolution 63/2005, MA, annexes, vol. VII, annexe 10 ; MA, par. 2.54.
16
MA, annexes, vol. V, annexe 7, p. 373-390 ; et CMU, vol. VII, annexes 161-164 et 167.
17
CMU, vol. VII, annexe 164.
18CMU, vol. II, annexe 20, p. 9, sections 4.1 et 3.2 respectivement. - 10 -
beaucoup plus tôt, bien avant que des évaluations aient été effectuées, de telle manière que tout ce
qui a suivi était seulement une justification ex post facto d’une décision politique antérieure de
construire l’usine à cet endroit. M.Reichler dit que l’Uruguay n’a procédé à la construction de
l’usine que sur la base de ce taux élevé d’invers ion du courant. Comme nous l’avons vu, ceci est
totalement incompatible avec la manière dont l’Uruguay a plaidé sa cause, totalement dénué de
preuves, quelles qu’elles soient. Les écritures confirment que toutes les décisions pertinentes prises
postulaient que les inversions de courant étai ent rares, voire inexistantes. Ces hypothèses
reposaient sur des modèles erronés. Là encore, le point clef est le suivant: les autorités
uruguayennes ont fait fond sur des hypothèses relatives à l’inversion du courant qui étaient fausses
⎯elles ont supposé à tort que le fleuve pouvait di sperser les effluents. Ce chiffre de29% a
peut-être été ultérieurement communiqué à l’Argentine dans le cadre du processus du GTAN, mais
rien n’atteste que les décideurs uruguayens en aient jamais tenu compte. L’Uruguay a toujours
considéré que l’inversion du courant était un phénomène «rare» et exceptionnel. Pourquoi doit-il
en être ainsi ? La seule conclusion possible est qu’un taux d’inversion du courant de29% aurait
très mal auguré de l’avenir du projet. En fait, il aurait fait capoter le projet dès le départ. Aucun
Etat raisonnable n’autoriserait un projet de ce type en un endroit où le courant du fleuve contribue
si peu à disperser les polluants. Ceci est d’autant plus vrai lorsque les eaux, en cet endroit précis,
sont déjà connues pour être eutrophiques, comme l’a reconnu la DINAMA. Donc le chiffre a été
enterré et n’est réapparu que la semaine derniè re, face aux difficultés très réelles que nos données
posaient à l’Uruguay.
13. Ce projet avait besoin de l’argent de la SFI, et le processus d’examen et d’approbation a
donc échu à cette instance internati onale. Passons brièvement en revue le même processus, étape
par étape. L’approbation de la SFI est interv enue en novembre2006, et elle faisait suite à
l’établissement d’une série de quatre rapports : une étude d’impact cumulé, puis le premier
rapportHatfield, puis une étude d’impact cumulé finale, et enfin le second rapport Hatfield. Ces
rapports ont-ils averti la SFI de l’existence d’un taux d’inversion du courant de 29 % ou 23 % ? Ils
ne l’ont pas fait. Ce n’est pas tant que la SFI s’ est trompée : c’est ceux qu’elle a engagés et sur les
travaux desquels elle a fait fond qui se sont trompés. - 11 -
20 14. Le premier document, le projet d’étude d’impact cumulé, est publié en décembre2005.
Que dit-il ? Il indique que l’inversion du cour ant des eaux de surface ne se produit qu’en «de rares
occasions» qui n’ont été que «brièvement enregistrées à Fray Bentos», et il ajoute ensuite que «ces
19
rares événements d’inversion du courant ne durent que quelques heures» .
15. Le projet d’étude d’impact cumulé a ét é examiné par M. McCubbin et son collègue dans
le premier rapport Hatfield, publié le 27 mars 2006. Ce rapport exprimait des préoccupations sur la
distribution du panache d’effluents. Il recommandait que l’on procède aussitôt que possible à une
modélisation de la dispersion des effluents en tena nt compte de la température de ceux-ci et des
diverses possibilités en ce qui concerne le courant, notamment l’inversion du courant et la
20
stagnation, afin de définir plus précisément la zone de mélange .
16. On pourrait supposer que l’Uruguay se serait vivement intéressé à ce processus. Cela
aurait le moment pour lui d’intervenir et de dire «attendez une sec onde, vous vous trompez
complètement sur le taux d’inversion du courant». A- t-il fait cela ? Non, il ne l’a pas fait. A-t-il
communiqué les informations ⎯dont M.Reichler dit maintenant que l’Uruguay les avait en sa
possession ⎯ qui montraient que le taux d’inversion du courant était de 29 % ? Non, il ne l’a pas
fait.
17. L’EIC finale a été publiée le 12 octobre 2006. Et elle évoque une nouvelle modélisation
qui a été effectuée mais, et cela est surprenant, elle aboutit exactement aux mêmes conclusions que
le projet initial. Etonnamment, la nouvelle modélis ation aboutit … exactement au même résultat !
L’étude conclut : «En de rares occasions le courant peut s’inverser et couler vers l’amont pendant
de courtes périodes. Ces inversions de couran t peuvent se produire quelques fois par an ou moins
fréquemment…» 21 Rares? Quelques fois par an ou moins? Ceci n’est pas tout à fait la même
chose que les 29% dont vous a parlés M.Reichler la semaine dernière, et qui ont maintenant été
adoptés par l’Uruguay comme étant la base de toutes les décisions qu’il a prises.
18. Et que s’est-il passé ensuite? Le deuxième rapport Hatfield a été achevé le
14 octobre 2006 ⎯deux jours après la publication de l’ EIC finale. L’EIC finale compte
19MA, annexes, vol. V, annexe 6, p. 24, par. 3.3.
20
MA, annexes, vol. V, annexe 6, p. 24, par. 3.3.
21MA, annexes, vol. V, annexe 9. - 12 -
221pages, et près de 800pages d’ annexes techniques. Pourtant, malgré le délai étonnamment
court dont ils disposaient, M. McCubbin et son co llègue ont d’une manière ou d’une autre réussi à
achever et reviser le travail en temps voulu et u tilement. S’agissant de la dispersion des polluants
21
dans le fleuve, ils ont conclu: «la modélisati on de panache revisée est bien faite» et «fournit
d’excellentes configurations de panache et taux de dilutions au niveau des flux importants du
fleuve» 22. La modélisation était peut-être «bien faite» mais elle semble avoir abouti à des résultats
complètement et totalement faux, au moins au sens où elle contredit directement l’acceptation
nouvelle par M. Reichler du taux d’inversion du courant de 29 %. Les auteurs du rapport Hatfield
ont avalisé un rapport d’EIC qui concluait que l’ inversion du courant était «rare», et ne se
produisait que «quelques fois par an ou moins». Là encore, l’Uruguay s’est-il hâté de rectifier
l’erreur? Il ne l’a pas fait, et il ne l’a pas fa it pour la raison évidente qu’il approuvait cette
évaluation, utile au projet. Qu’ont dit les auteurs du rapport Hatfield su r le fleuve dans leurs
conclusions? Rien. Un lecteur attentif de l’ intégralité du dernier rappor t Hatfield ne trouvera
qu’une phrase sur le courant du fleuve: «Le fleuve Uruguay est un très grand cours d’eau.» 23
C’est tout. «Un très grand cours d’eau.» Et, c’est sur la base de cette brillante analyse que
quelques semaines plus tard, le 21 novembre 2006, la SFI a approuvé le financement du projet
19. Donc, l’Uruguay a-t-il fait fond du chiffre de 29 % et en a-t-il tenu compte ? La réponse
est non. La SFI a-t-elle fait fond sur le chiffre de 29 % ? La réponse est non. A chaque stade du
processus, les décisions ont été prises en postulant que l’inversion du courant était «rare». «Je ne
disposais pas d’information», a avoué le conseil de l’Uruguay la semaine dernière. Eh bien, il
semble que l’Uruguay ait caché ce chiffre de 29%, même à son conseil, en2006. Et on peut
supposer que c’est la raison pour laquelle le con seil de l’Uruguay n’a pas compris jusqu’où les
effluents de Botnia remonteraient en amont : il adme t maintenant qu’ils peuvent aller en amont. Et
il semble aussi que M. McCubbin n’avait pas l’i nversion du courant très présente à l’esprit, ou que
la SFI n’avait pas d’informations exactes sur l’inversion du courant réellement à l’esprit lorsqu’elle
a approuvé le projet. Pourtant, M.Reichler ad met qu’il s’agit d’une information cruciale, parce
qu’elle détermine où vont les effluents. La plupart de ceux-ci, comme je l’ai dit il y a
22
CMU, vol. VIII, annexe 178, p. 3, sect. A16.
23
Ibid. - 13 -
deux semaines, remontent le fleuve. C’est ce que montrent les données, c’est ce que montrent les
simulations. Et l’Uruguay l’admet maintenant. Peut-être ne l’admet-il pas, peut-être essaiera-t-il la
semaine prochaine, ou plus tard cette semaine, de vous persuader que , d’une manière ou d’une
autre, un taux de 29% n’a aucun impact sur la dispersion des polluants de l’usine Botnia.
Franchement, à ce stade, ça ne serait pas un argument sérieux. Ayant accepté un taux élevé
d’inversion du courant, l’Uruguay est tenu d’en accept er les conséquences. Et de là à conclure que
22 l’usine n’aurait jamais dû être construite à cet endro it, il n’y a pas loin. Telle est la réalité au cŒur
de la présente affaire, et cette question et les faits sont décisifs.
III. Experts indépendants
20. Avant de passer à la question de la pollu tion, le moment me semble bien choisi pour
répondre aux importantes questions posées par le jugeBennouna. Le jugeBennouna a demandé,
premièrement, ce que les Parties entendaient pa r un «expert indépendant» et deuxièmement, si,
dans le contexte de la présente affaire, un expert mandaté par l’une ou l’autre d’entre elles pouvait
être qualifié d’«expert indépendant». Nous avons, bien sûr, suivi avec un grand intérêt la plaidoirie
de M.Reichler sur ce point, qui revenait pour l’essentiel à affirmer que toute personne mandatée
par une Partie ne pourrait être tenue pour «indépendante» au sens de la question du juge Bennouna.
Je comprends fort bien que M. Reichler adopte ce point de vue, qui a le très grand mérite de laisser
ce côté-ci de la salle quasiment vide de tout expert indépendant, tandis que nos collègues, de l’autre
côté, pourraient s’appuyer sur un essaim d’expert s indépendants lointains à qui vous devriez ⎯ à
en croire M.Reichler ⎯ faire une confiance aveugle, bien qu ’ils n’aient établi aucun rapport aux
fins de cette instance, n’aient examiné aucun des éléments de preuve produits par l’Argentine en
l’espèce, et n’aient été amenés à s’exprimer devant la Cour sous aucune forme. Las, les choses ne
sont pas aussi simples que M. Reichler ne le donne à entendre !
21. Nous ne sommes pas devant une cour de justice anglaise , ni devant un tribunal de
Washington. Nous sommes devant la Cour internationale de Ju stice, et il convient donc de
répondre à la question du juge Bennouna en nous référant aux règles de cette Cour et à la pratique
de cette Cour; or, l’analyse de ces règles et de cette pratique amène ⎯ soutenons-nous ⎯ à une
autre conclusion, plus nuancée. Le Statut et le Règlement de la Cour mentionnent bien sûr les - 14 -
experts, mais pas les «experts indépendants» 24. Il ne semble pas y avoir de divergence entre les
Parties sur ce qu’on entend par «expert». Le Dictionnaire de droit international public de
M. Salmon définit celui-ci en ces termes :
«Une personne choisie pour ses connaissances techniques et qui peut être
chargée dans un procès:
a) Par une partie ou par le tribunal d’éclai rer ce dernier sur certaines questions
litigieuses...
b) Par une partie, de faire partie de sa délégation et de participer aux
plaidoiries...»25
23 Voilà une définition qui paraît tout à fait lé gitime. Qu’en est-il, maintenant, du concept
d’indépendance ? Selon nous, la question de l’indépendance doit être appréciée principalement à la
lumière de deux considérations: la relation qu’entretient l’indivi du avec, premièrement, la ou les
Partie(s) et, deuxièmement, les questions en jeu dans une affaire donnée. Cette manière de voir est
conforme à l’optique adoptée dans le Dictionnaire, qui définit l’«indépendance» d’une personne
comme «le fait pour [celle-ci]...de ne…dépendre d’aucune autre autorité que la sienne
propre ... ou tout le moins, de ne pas dépendre de l’Etat sur le territoire duquel elle exerce … [ses]
fonctions...» 26. Compte tenu de ces considérations, nous n’avons absolument aucun mal à admettre
que les rapports écrits établis aux fins de la présente instance par ⎯ par exemple ⎯
M.CharlesMenzie doivent être considérés co mme des rapports d’expert indépendant, puisque
(pour autant que nous le sachions) M. Menzie n’est nullement intéressé, personnellement, à ce que
le différend soit tranché dans un sens ou dans un autre (puisqu’il n’a pas ⎯ vous l’avez compris ⎯
pris part au processus ayant mené à la déci sion de la SFI) et n’est pas fonctionnaire du
Gouvernement uruguayen. Ses vues peuvent légitimement se voir accorder la considération
reconnue à celles d’un expert indépendant, même si, nous dit-on maintenant, elles seraient
24Statut de la Cour, art. 43, 50 et 51 ; Règlement de la Cour, art. 57, 58, 62, 63, 64, 65, 67, 68, 70 et 71.
25
J. Salmon (sous la dir. de), Dictionnaire de droit international public, 2001, p. 483.
«A person chosen for their technical knowledge and who, in legal proceedings, may be asked:
(a) by a Party or court to shed light on certain matters in dispute . . .
(b) by a Party, to be a member of its delegation and to participate in the hearings . . .»
26
Ibid., p. 570.
«defines a person’s «independence» as «the fact thatperson... does not depend on any other authority than
their own . . . or at the very least, does not depend on the State in whose territory they perform their duties . . .»» - 15 -
erronées, et même manifestement erronées (et j’ajouterai que nous comprenons bien ⎯ et relevons
avec intérêt ⎯ que l’Uruguay préfère éviter que M.Menz ie ne comparaisse devant la Cour,
puisqu’il a déclaré, clairement et sans ambiguïté, que les périodes de débit extrêmement faibles
étaient «rares», et que, bien sûr, cette affirma tion se trouve maintenant en contradiction avec le
27
véritable argument avancé par l’Uruguay) . Mais, de la même façon, MM.Colombo et Wheater
sont des experts, et sont indépendants : ils ne sont pas fonctionnaires du Gouvernement argentin, et
ils n’ont pas personnellement intérêt à ce que l’affair e soit tranchée dans un sens ou un autre. Ce
sont, en réalité, des universitaires éminents, jouissant d’une réputation internationale qu’il leur faut
préserver. Puisqu’ils sont les auteurs de rapports versés au dossier de la présente instance, il n’y a
rien de remarquable à ce que MM. Menzie, Colombo et Wheater aient été invités à se joindre aux
délégations des Etats qui avaient, respectivement, sollicité leurs connaissances d’experts.
22. D’autres membres des délégations des deux Parties, en revanche, ne doivent pas être
considérés comme des experts indépendants, non pas, nécessairement, que ce ne soient pas des
experts, mais parce qu’ils ne sont pas indépendants. Un employé de l’Etat ne peut être considéré
comme indépendant, ne serait-ce que parce que la re lation qu’il entretient avec l’Etat est de telle
24 nature que ce dernier pourrait être à même d’exercer une influence sur les vues qu’il exprime. Loin
de nous l’idée de critiquer ME. stebaLyons, qui fait partie de notre équipe, ou
Mme Alicia Torres, qui fait partie de celle de l’Uruguay ; il s’agit simplement de reconnaître le fait
que tous deux sont des fonctionnaires permanents, employés à temps plein par leurs gouvernements
respectifs, qu’ils font partie de l’administration, partie de l’appareil d’Etat⎯qu’ils n’en sont pas
indépendants.
23. Pour des raisons différentes, cette fois , nous affirmons que le cas de M. McCubbin doit
être distingué de celui de MM.Menzie, Colombo ou Wheater. M.McCubbin n’est pas
indépendant, parce qu’il a intérêt à voir l’affaire tranchée dans un certain sens : le 14 octobre 2006,
il a en effet signé le rapport Hatfield, sur lequel la SFI s’est basée pour prendre sa décision en
matière de financement. C’est lui, avec l’ un de ses collègues, M.WilliamDwernychuk, qui a
approuvé l’étude d’impact cumulé finale, et t ous deux ont validé la conclusion selon laquelle
27
CMU, p. 443, par. 6.93. - 16 -
l’inversion du courant serait un phénomène rare. Dès lors, quand M. McCubbin plaide devant vous
en qualité de conseil, il ne fait pas ce qu’ont fait tous les autres⎯ à savoir détailler la teneur des
rapports écrits qu’ils ont soumis aux Parties et que celles-ci ont versés au dossier. M.McCubbin
n’est pas l’auteur d’un rapport: il s’emploie à jus tifier sa propre décision, en tant que partie
prenante au processus mis en place par la SFI, et il a directement, et personnellement, intérêt à ce
que la Cour rende une décision qui entérine son point de vue. C’est la raison pour laquelle il ne
peut, soutenons-nous, être considéré comme indépendant. Nous avons du reste été fort surpris que
l’Uruguay puisse vouloir le faire entendre par la Cour à un quelconque autre titre que celui de
témoin appelé à subir un contre-interrogatoire. Permettez-moi d’illustrer mon propos : la situation
de M.McCubbin ne diffère en rien de l’expé rience que nombre d’entre nous, dans cette pièce,
avons vécue en tant qu’experts en droit inte rnational appelés à assister une organisation
internationale intervenant sur un point en litige entre deux Etats. C’est un cas de figure
relativement fréquent. Mais nous ne rejoignons pas ensuite les rangs de la délégation de l’un des
Etats parties à ce même litige. Nous ne le faisons pas, parce qu’une telle attitude soulèverait de
réels doutes quant au jugement ou à la conf identialité, et susciterait nécessairement des
interrogations sur notre indépenda nce dans le cadre de la condu ite des travaux réalisés pour
l’organisation internationale en question. Et c’est précisément pourquoi nous nourrissons de réelles
inquiétudes au sujet du rôle de M. McCubbin en la matière, de sa relation avec l’Uruguay, et d’une
situation qui s’apparente, de ce côté-là de la salle, à un vérita ble chassé-croisé dont les acteurs
nouent et dénouent différents liens avec différents intervenants.
24. Certes, c’est à l’Uruguay et à lui seul d’ arrêter la composition de sa délégation. Si
l’Uruguay veut se passer des services d’un spécialiste de l’hydrologie fluviale, s’il ne veut pas que
la Cour puisse entendre un quelconque expert en fluvi ométrie, fût-ce un expert sorti de ses propres
25 universités, libre à lui. Mais soyons bien clairs: M.McCubbin n’a pas de connaissances
techniques dans ces domaines. Sa formation et son expérience professionnelle sont celles d’un
ingénieur. Il n’est pas expert en fluviométrie, en hydrologie, ni en modélisation (et, de fait, il
semble que l’Uruguay ne compte aucun expert en ces matières dans sa délégation). D’où la
question que nous nous posons : à quel titre M. Mc Cubbin a-t-il pu indiquer à la SFI que, selon lui,
ce fleuve pourrait supporter ce niveau de pollution, ou que les modèles hydrographiques employés - 17 -
étaient ⎯ je le cite ⎯ «excellents» ? Est-il expert en modélisation ? Certes, nous n’avons pas reçu
copie de son curriculum vitae, mais il semble bien que non. Et rien ne nous porte à croire que
M.Dwernychuk, coauteur du rapport Hatfield, so it un spécialiste de la modélisation ou des
courants fluviaux: il est titulaire d’un doctorat en biologie et d’une maîtrise en zoologie. Et,
néanmoins, la SFI s’est appuyée sur les travaux de MM. McCubbin et Dwernychuk pour conclure
que le fleuve pouvait absorber ce niveau de pollu tion, parce que l’inversion du courant serait un
«phénomène rare». Voilà des circonstances qui nous paraissent rien moins qu’idéales ⎯et ce, à
plus forte raison si l’on prend en considération le parcours personnel de M. McCubbin, qui semble
assez étroitement lié à l’industrie de la pâte à papi er. Entendons-nous bien. Il ne s’agit nullement
ici d’une critique à l’encontre de M. McCubbin, ou de l’industrie de pâte à papier, laquelle fournit
un service dont nous sommes tous bénéficiaires et tributaires: comme elle l’a dit à plusieurs
reprises, l’Argentine n’a aucun a priori contre les usines de pâte à papier ⎯elle considère juste
que cette usine ne devrait pas se trouver à cet endroit. Non, ce qui, de plus en plus, nous
préoccupe, c’est de savoir comment une personne si étroitement liée à la promotion de l’industrie
peut avoir été choisie pour jouer un rôle aussi important au sein du processus mis en place par la
SFI. Sur ce point, Monsieur le président, M essieurs de la Cour, vous vous rappellerez que
M.Wheater a fait référence au projet d’us ine de pâte à papier Gunns en Tasmanie ⎯ cette usine
qui a suscité une vague d’opposition, et dont les efflue nts ne seront pas rejetés dans le fleuve mais
amenés, au moyen d’un pipeline long de plusieurs kilomètres, jusqu’à la côte, pour être déversés en
mer, à trois kilomètres du littoral. Eh bien, M. Mc Cubbin a exprimé un avis sur ce projet. De fait,
en mars2005, peu avant d’être amené à travailler su r ce projet-ci, il avait été invité en Tasmanie
pour parler des effets sur l’environnement de cet autre projet. Qui l’avait invité? L’APPITA,
l’association technique australienne de l’in dustrie de pâte à papier et du papier ⎯ une association
qui compte parmi ses membres au moins une soci été, Mezzo, liée aux activités de l’usine de
Fray Bentos 28. Il semble que M. McCubbin ait été inv ité en Tasmanie avec pour mission d’apaiser
les craintes des habitants. Vous pourrez vous faire une idée de la manière dont il s’est employé à
26 s’en acquitter pour cette association professionnelle, et de la rigueur de son approche des questions
28
http://www.appita.com.au/Sustaining%20Members#M. - 18 -
fluviales, en lisant l’entretien qu’il a accordé à l’Australian Broadcasting Corporation, dont la
retranscription figure dans vos dossiers de plaidoiries, à l’ongle
tn o3. Nous vous laisserons en
prendre connaissance à votre convenance. Il est édifiant.
25. Monsieur le président, nous n’aurions rien trouvé à redire si M.McCubbin ⎯ ou toute
autre personne ayant participé aux travaux d’EcoMetrix ou d’Hatfield ayant un intérêt personnel à
voir l’affaire tranchée dans un sens ou dans un autre ⎯ avait été cité à comparaître devant la Cour
aux fins d’y subir un interrogatoire et un contre-int errogatoire, dans le respect des dispositions de
l’article 57. Cette procédure aurait été tout à fa it valide, et aurait permis d’éprouver les points de
vue des intéressés. L’Uruguay était libre d’opter po ur cette voie, il ne l’a pas fait. A défaut de
pouvoir les mettre à l’épreuve, nous ne voyons tout simplement pas comment l’on pourrait
accorder à leurs travaux, comme le voudrait M.Reichler, davantage de poids qu’à ceux de
MM. Menzie, Colombo ou Wheater. Et il y a un autr e point, connexe, que M. Reichler n’a pas du
tout abordé. La pratique de la Cour consiste depuis longtemps à permettre aux Etats d’attacher à
leurs délégations des experts techniques ou scientifiques indépendants en les autorisant à se
présenter devant la Cour en qualité de conseils. Le fait que ces experts plaident devant elle
n’entame en rien l’indépendance de leur analyse, ou de l’analyse exposée dans tout rapport écrit
qu’ils auraient pu rédiger et soumettre à la C our. Nous sommes un certain nombre, dans cette
pièce, Monsieur le président, à avoir encore pr ésentes à l’esprit les circonstances de l’affaire
opposant la Hongrie à la Slovaquie. L’une et l’ autre comptaient dans leurs délégations des
universitaires de renom, qui sont intervenus devant la Cour pour lui présenter leurs rapports ou
domaines de compétence. A aucun moment il n’a été donné à entendre que leurs points de vue
n’étaient pas des points de vue indépendants. La Cour les a entendus, et elle a ensuite apprécié le
degré de confiance qu’il convenait d’accorder à leur s analyses et opinions. Nombre d’autres Etats
ont suivi la même approche. Ils l’ont fait pa rce qu’une Cour comme la vôtre, qui incarne
différentes traditions juridiques et différentes conceptions des questions relatives à l’administration
de la preuve et aux avis d’experts, doit nécessai rement faire montre d’une certaine souplesse dans
sa manière d’aborder la question de la collecte et de l’utilisation des moyens de preuve et des avis
d’experts. Elle le doit d’autant plus que, les juges qui y siègent étant particulièrement nombreux,
sa structure se prête moins bien à la tenue d’un interrogatoire et d’un contre-interrogatoire, et que le - 19 -
temps ménagé pour la tenue d’audiences apparaît limité. Les Etats doivent être sensibles aux
réalités et aux aspects pratiques de la justice internat ionale, et l’on ne peut partir du principe qu’il
suffira de transposer d’un système national à celui de la Cour telle ou telle culture ou tradition
juridique. La démarche que M. Reichler vous presse d’adopter im pliquerait un réel changement
dans la pratique de la Cour: les auteurs des rapports produits au stade de la procédure écrite
auraient, pour que leurs travaux puissent se voir accorder le moindre poids, à se soumettre à un
27 interrogatoire et à un contre-interrogatoire. Dans des affaires complexes, du point de vue
technique, telles que celle qui nous occupe aujourd’hui, cela impliquerait des audiences longues de
plusieurs mois. Il ne nous semble pas, à priori , que telle soit nécessairement la voie dans laquelle
la Cour voudra s’engager.
26. Pour toutes ces raisons, nous vous invitons à rejeter l’optique adoptée par l’Uruguay et à
confirmer la pratique établie de la Cour. En réponse à la question du juge Bennouna, des experts
individuels tels que MM.Me nzie, Colombo et Wheater doivent être considérés comme
indépendants, et leurs vues se voir reconnaître le poi ds et la crédibilité que la Cour jugera bon de
leur accorder. Vous avez vous-même entendu MM .Colombo et Wheater, et c’est à vous qu’il
revient d’apprécier le degré de c onfiance qu’il convient de leur accord er et de juger, au fond, de
leurs propos.
IV. La prévention de la pollution et les modifications de l’équilibre écologique
27. J’en arrive à la question suivante, celle de la pollution et de l’équilibre écologique. Nous
nous félicitons que l’Uruguay ait accepté la per tinence du principe de précaution et que les deux
Parties reconnaissent le principe15 de la déclar ation de Rio comme la norme applicable. Ce
principe s’applique en tant que règle générale du droit international et, par renvoi, également en
tant que règle conventionnelle en application des articles premier à 41 a) du statut, et nous vous
invitons à l’appliquer.
28. M.Boyle a examiné la question de la pollution à deux occasions. Lundi dernier, il a
brandi les normes de la CARU, affirmant que les op érations de Botnia n’entraînaient «pas…la
moindre violation des normes applicabl es de qualité de l’eau de la CARU» 29. «Not… any
29
CR 2009/16, p. 33, par. 50. - 20 -
violation.» Voilà qui est clair et dénué de toute ambiguïté ⎯en admettant bien sûr que le mot
«any» ait son sens habituel, tel que nous l’entendons, et le sens qu’il a aussi à l’article 36 du statut.
M. Boyle a renchéri mercredi en affirmant que les normes de la CARU «serv[aient] à définir ce qui
30
constitue la pollution aux fins» du statut . Il s’ensuit, je le cite, que l’on «peut présumer que l’eau
qui satisfait [aux normes de la CARU] n’est pa s polluée et que les rejets d’effluents qui
n’entraînent pas un dépassement de [ces normes] ne sont pas nocifs pour le milieu aquatique» 31.
La formule est selon nous inacceptable, puisqu’elle signifierait qu’une substance non répertoriée
28 par la CARU ⎯les nonylphénols par exemple ⎯ ne serait de ce seul fait pas considérée en soi
comme un polluant. Cet argument est fallacieux.
29. Néanmoins, il a le grand mérite d’être simple. Le problème, avec un argument simple,
c’est qu’il fonctionne encore lorsqu’on le retourne : si l’on suit la logique de M. Boyle, il s’ensuit
nécessairement que les rejets qui, eux, contribue nt à la violation des normes de la CARU, ou à
l’aggravation de violations, doivent être traités en soi comme des rejets causant une pollution
nocive de l’environnement aquatique et auxquels il faut mettre un terme. Bien entendu, l’Uruguay
avance cet argument parce qu’il pense respecter les normes de la CARU. Mais les respecte-t-il?
Là encore, il semble que son conseil ne dispo sait pas de toutes les informations que possédait
l’Uruguay.
30. Examinons l’argumentation de M.Boyle. Prenons quelques exemples de normes de la
CARU et, pour éviter toute controverse, tenons-nous en à la surveillance de l’Uruguay lui-même.
Mais ne parlons pas du plan de surveillance de la DINAMA, qui a été remis à EcoMetrix, pour
évaluation et observations. M.Wheater vous a dit, lors du premier tour, combien les données de
surveillance fournies par la DINAMA et EcoMetrix étaient sélectives et trompeuses — pour ne rien
dire de la valeur d’une évaluation «indépendante» menée par EcoMetrix entièrement sur la base des
données communiquées par le Gouvernement uruguayen.
31. Examinons plutôt les données de surveillance fournies par les Obras Sanitarias del
Estado ⎯ OSE ⎯ le service national des eaux de l’Uruguay. Dans ses documents nouveaux
produits le 15juillet2009, l’Uruguay vous a communiqué quelques données de surveillance
30
CR 2009/18, p. 13, par. 7.
31
Ibid., p. 13-14, par. 7. - 21 -
desOSE, mais elles sont périmées: les chiffres indiqués concernent la période d’avril2007 à
novembre2008. Pourquoi ne vous a-t-il pas donné les chiffres de la période allant de
novembre2008 au 13mai2009, pendant laquelle s’est produite la prolifération d’algues, alors
même que ces données étaient disponibles en espagnol sur le site web des OSE 32? Bizarre
également que, lorsque l’Uruguay nous a re mis un tas de documents nouveaux il y a deux
semaines, il n’ait pas joint les données mises à jour des OSE. Mais vous allez comprendre
pourquoi. Nous sommes heureux de vous comm uniquer ces documents, qui figurent dans le
dossier d’audience en espagnol avec une traduction anglaise.
32. [Planche à l’écran, montrant l’emplaceme nt du point d’échantillonnage.] La première
question qui se pose est celle-ci: d’où viennent ces chiffres? Les résultats des OSE proviennent
du point de surveillance situé à la prise d’eau potable de Fray Bentos. Vous le voyez maintenant à
29 l’écran, en bleu. Et ce que vous voyez à côté à gauche, en rouge, c’est le point d’évacuation des
eaux usées de Fray Bentos. Ce qui est important ici, c’est que ce point est situé en amont de la
conduite d’évacuation des eaux usées de Fray Bentos, mais juste à 3 kilomètres au sud de Botnia, à
70 mètres de la rive. [Fin de la projection de la planche.] Les données récentes des OSE montrent
les résultats de la surveillance dans deux tableaux. Le premier couvre la période préopérationnelle,
du 19avril2007 au 6novembre2007; le second couvre la période postopérationnelle, du
13 novembre 2007 au 13 mai 2009. M. Boyle affirme que Botnia ne viole pas les normes de la
CARU, mais les chiffres montrent le contraire et montrent aussi que les effluents de Botnia
augmentent sensiblement la gravité de ces viola tions. Examinons juste deux paramètres dans le
temps qui nous reste.
33. Premier paramètre: l’oxygène dissous. Il correspond à la quantité d’oxygène dissoute
dans les eaux du fleuve. C’est l’un des paramètres pour lesquels le chiffre doit être élevé : plus le
chiffre est élevé, plus il y a d’oxygène dissous dans le fleuve et meille ures sont les conditions
écologiques; à l’inverse, plus le chiffre est bas, plus le dommage causé au fleuve est important.
Inutile de vous dire que la présence d’oxygène dissous est essentielle pour la vie du fleuve; si le
taux d’oxygène diminue, les poissons et les plantes me urent, et l’équilibre écologique du fleuve se
32
www.ose.com.uy/a_monitero_fray_bentos.html. - 22 -
modifie. Ce paramètre est d’une importance crucia le et il est lié au phénomène d’eutrophisation.
Commençons par la norme de la CARU en la mati ère. [Projection.] Selon la CARU, comme vous
le voyez dans la partie gauche, il doit y avoir dans le fleuve au minimum 5,6milligrammes
d’oxygène dissous par litre d’eau. Avant la mi se en service de l’usine, vous pouvez voir que la
valeur moyenne était déjà en dessous de ce seuil ; elle était de 4,9 milligrammes, c’est-à-dire déjà
inférieure d’environ 12% aux normes de la CARU. Que s’est-il passé après la mise en service?
Eh bien, nous constatons que la moyenne est to mbée à 3,8milligrammes, c’est-à-dire qu’elle est
désormais inférieure de 30 % aux normes de la CARU. Les données recueillies par M.Colombo
révèlent également une baisse, les niveaux relev és étant aussi en infraction avec les normes de la
33
CARU . Les rejets chimiques et biologiques de Botnia entraînent la disparition de l’oxygène, ils
font baisser les taux d’oxygène dans l’eau. Le tableau indique également les taux maximums
⎯c’est-à-dire les valeurs les plus élevées enregistrées au cours de la période ⎯, et vous noterez,
comme nous le faisons non sans inquiétude, que ces valeurs les plus élevées ont diminué, passant
de 8milligrammes avant la mise en service de l’ usine à 6,3milligrammes après, ce qui signifie
qu’elles se situent juste au-dessus des normes de la CARU. C’est là une violation claire de ces
30 normes. Voilà les preuves et elles montrent clairement qu’un changement écologique est en cours.
[Fin de la projection.]
34. Deuxième paramètre: les substances phénoliq ues. [Projection.] Nous sommes là dans
un cas de figure différent. S’agissant de ces substances, il n’y avait pas de violations antérieures,
c’est l’activité de l’usine Botnia qui a entraîné des violations. Dans le cas précédent, bien sûr, les
rejets de Botnia ont entraîné une aggravation des violations. Comme vous pouvez le voir à l’écran,
la norme de la CARU pour les substances phénoli ques est de 1 microgramme par litre. Voyons ce
qu’il en était avant la mise en service de l’usin e. Les concentrations de substances phénoliques
étaient inférieures à 1 ; autrement dit, elles étaien t si basses qu’elles ne pouvaient être détectées, ni
en moyenne, ni même en valeur maximale. Que s’est-il passé depuis que l’usine a démarré son
activité? Premièrement, la valeur moyenne s’ élève désormais à 3microgrammes par litre, soit
déjà trois fois plus que ce qu’autorisent les normes de la CARU. Et maintenant, regardez le chiffre
33
Documents nouveaux produits par l’Argentine, 30juin2009chap.3, voir le résumé analytique, par.2, et
sect. 3.2.3. - 23 -
le plus élevé, celui des valeurs maximales : 20,7microgrammes par litre. Les substances
phénoliques ont donc atteint des taux vingt fois plus élevés que les normes de la CARU, ce qui
constitue un dépassement de 2000 %. [Fin de la projection.]
35. Intéressons-nous maintenant à un troisième paramètre, à savoir le phosphore. Et c’est un
sujet sur lequel M.Boyle s’est montré partic ulièrement nerveux. Il a reconnu que les
34
concentrations de phosphore étaient «trop élevé[e] s» même avant la mise en service de l’usine .
En fait, comme nous l’avons dit, les deux Parties conviennent que les eaux du fleuve étaient déjà
eutrophiques lorsque l’Uruguay a délivré la premiè re autorisation le14février2005, et c’est
pourquoi l’usine n’aurait jamais obtenu d’au torisation dans aucun Etat membre de
l’Unioneuropéenne. M.Boyle s’est empressé de préciser que la CARU n’avait pas édicté de
normes concernant le phosphore, allant même jusqu’à laisser entendre que cela était dû à
l’Argentine 35. Il se trouve que je suis en mesure de le contredire : c’est l’Uruguay qui a empêché
l’adoption par la CARU de normes concernant le phosphore et ce, assez récemment. En2005,
l’Argentine a proposé d’ajouter de telle s normes dans le digeste de la CARU 36. L’année suivante,
l’Uruguay a fait obstacle à cette proposition car elle figurait dans une autr e proposition qui aurait
conduit la CARU à adopter une approche écologi que globale à l’égard de ses activités, ce que
31 l’Uruguay n’était pas prêt à accepter 3. Ce que M. Boyle n’a cependant pas pu se résoudre à dire,
c’est que les concentrations de phosphore étaien t non seulement «trop élevé[e]s» mais qu’elles
violaient les normes de l’Uruguay, ce qui est pourtant bel et bien le cas. M. Boyle a déclaré devant
la Cour que, depuis que l’usine avait démarré son act ivité, les niveaux de phosphore dans le fleuve
n’avaient pas augmenté. Cela est faux. Nous avons communiqué les chiffres du monitoring de
M.Colombo, lesquels démontrent que les con centrations de phosphore réactif solide (PRS) ont
augmenté, et M. Wheater a par ailleurs démontré que les tentatives de M. Reichler pour minimiser
ces chiffres révélaient l’évidente difficulté éprouvée de l’autre côté du fleuve pour faire face à un
34 CR 2009/16, p. 33, par. 52.
35 CR 2009/18, p. 16, par. 13.
36 Voir le procès-verbal 05/2005 de la CARU, rapport 253 de la sous-commission de la qualité des eaux et de
la prévention de la pollution, p.1032, auquel est joint en annexeC un rapport du délégué de l’Argentine, LucioJaniot,
recommandant que des normes relatives au phosphore soient ajoutées au digeste, p. 1042 à 1045.
37 Voir le procès-verbal 07/2006 de la CARU, rapport n 264 de la sous-commission de la qualité des eaux et de
la prévention de la pollution, p. 02442. - 24 -
nombre croissant de données. Quoi qu’il en soit, il n’est pas nécessaire que nous nous fondions sur
les chiffres de M. Colombo. Une fois encore, nous pouvons nous fonder sur les chiffres des OSE,
c’est-à-dire ceux de l’Uruguay.
36. Que révèlent ces chiffres? [Projec tion.] Commençons donc par les limites de
o
l’Uruguay. Dans la part ie gauche du tableau, vous pouvez voir que le décret n 253/79 de
l’Uruguay fixe pour la concentra tion de phosphore une limite maximale de 0,025mg/l. Il ressort
des chiffres des OSE que la concentration moyenne de phosphore dans l’eau devant l’usine Botnia
était, avant la mise en service de l’usine, de 0,08 mg/l, soit déjà plus de troisfois supérieure aux
limites de l’Uruguay. Que s’est-il passé après la mise en service ? Eh bien, cette valeur moyenne a
augmenté, atteignant 0,09mg/l. Cela repr ésente une augmentation de 12% par rapport aux
concentrations préopérationnelles mais surtout, cette augmentation de 0,01 représente près de 50 %
de la limite autorisée par la propre législation de l’Uruguay. Sur quoi M. Boyle se fonde-t-il donc
pour déclarer devant la Cour que les concentr ations de phosphore n’ont pas augmenté? Ces
augmentations se révèlent enco re plus importantes lorsqu’on ex amine les valeurs maximales.
Avant la mise en service, les valeurs maximales de phosphore étaient de 0,109 mg/l, soit quatre fois
supérieures à la limite autorisée par l’Uruguay. Que s’est-il passé après la mise en service de
l’usine ? Eh bien, la valeur maximale a encore augmenté, passant à 0,54 mg/l. Ce chiffre est plus
de vingtfois ⎯ vingt fois ⎯ plus élevé que les limites autorisées en Uruguay même. Je me
demande donc comment les conseils de l’Urugua y peuvent soutenir sans broncher qu’il n’y a pas
eu d’augmentation ⎯ pas d’augmentation ⎯ alors que les propres chiffres de leur client
démontrent le contraire? Comment peuvent-ils affirmer, s’agissant de l’oxygène dissous et des
substances phénoliques, qu’il n’y a aucune vi olation des normes de la CARU? Comment
peuvent-ils se présenter à la barre pour dire cela, alors que les violations de ces normes sont
32 nombreuses et de plus en plus fréquente? J’entends déjà d’ici leur version de la chanson
d’Edith Piaf : «Oui, je regrette beaucoup, encore une fois, je n’avais pas l’ information…» [Fin de
la projection.]
37. Il faut dire que, dans les thèses qu’il soutient, l’Uruguay n’a pas toujours fait preuve de la
plus grande constance. Ni de la plus gra nde clarté. En fait, on a souvent l’impression que
l’Uruguay et ses avocats ne savent absolument pa s ce qui sort de cette usine. Leur manière - 25 -
d’aborder le problème emblématique des nonylphénol s le montre bien. Nous avons tous entendu
M.Reichler la semaine dernière: il a d’abord dit à la Cour que l’Uruguay était «convaincu que
Botnia ne «fait» aucun usage des nonylphénols ⎯ notez bien qu’il n’a pas dit qu’elle «n’a jamais
fait» aucun usage des nonylphénols. Puis il a ajouté que, si Botnia utilise effectivement des
nonylphénols, l’Uruguay y mettra bon ordre 38. La remarque est très révélatrice : il n’a aucune idée
de la réponse. Nos adversaires ne savent pas ce qui sort du conduit d’évacuation. Mais votre Cour
statue sur le fondement de preuves, et non de convictions. Des preuves écrasantes, je dis bien
écrasantes, montrent que l’usine a utilisé des nonyl phénols, et qu’elle en utilise peut-être encore.
On a aussi relevé une augmentation spectaculair e des substances phénoliques, en quantités trois
fois supérieures aux niveaux autorisés par la CARU. L’Uruguay n’a jamais donné la moindre
explication du procédé utilisé pour éliminer les substances lipophiles des copeaux d’eucalyptus. Il
y a quinze jours, je l’ai invité à communiquer une liste détaillée de tous les produits chimiques que
l’usine utilise depuis2007 dans ses procédés de nettoyage. Nous a- t-il donné cette liste? Non.
Vous l’a-t-il donnée ? Non ! Sur ce point du moins il fait preuve d’une certaine constance, puisque
l’Argentine réclame depuis longtemps ce genre d’informations et que depuis longtemps ces
informations n’ont pas été communiquées. En fait, en octobre 2005, dans le cadre des travaux du
GTAN, l’Argentine avait demandé des renseignements concernant le «processus de production de
l’usine Botnia en projet». L’Uruguay avait répondu ceci : «dans la mesure où les renseignements
dont dispose la délégation argentine sont les mêmes que ceux dont dispose la délégation
uruguayenne, la demande de renseignements a dû être transmise à la société. Aucune réponse n’a
39
été reçue à ce jour.» En janvier 2006, l’Uruguay a reconnu que les renseignements que réclamait
l’Argentine avaient été demandés à la société Botn ia, mais il a seulement indiqué que «[Botnia
40
avait] répondu en fonction de l’état d’avancement de [ses] projets» . Aucun renseignement, nous
attendons toujours.
33 La Cour observera que, depuis quatre ans, le schéma est toujours le même : nous regrettons, nous
n’avons pas ces renseignements, Botnia les a, mais pas l’Etat. En lisant des déclarations comme
38CR 2009/17, p. 24, par. 28.
39
CMU, vol. V, annexe 145, sect. V.
40CMU, vol. V, annexe 154, p. 2. - 26 -
celle-là, on est tenté de tirer la conclusion regrettable que l’Uruguay, en fait, a simplement laissé à
la société Botnia le soin de gérer ce problème ⎯et de gérer le fleuve Uruguay. Imaginez notre
surprise la semaine dernière à la lecture d’une interv iew d’un politicien uruguayen important, un
ancien ministre du gouvernement qui est aujourd’hui le candidat du parti du gouvernement aux
élections présidentielles. Que dit-il? Je le cite : «Les eaux de la rivière Uruguay sont sous la
responsabilité des Finlandais.» Voilà ce que Jose Mujica a dit il y a quinze jours : «Les eaux de la
rivière Uruguay sont sous la responsabilité des Finla ndais. Elles ne dépendent ni de l’efficacité de
l’Uruguay ni de l’efficacité de l’Argentine.» Et il a ajouté : «Les Finlandais ne sont pas bêtes, ils
41
sont très prudents et se préoccupent [de l’environnement] beaucoup plus qu’aucun d’entre nous.»
38. Monsieur le président, il semble qu’il n’a it pas dit ça par plaisanterie. Le Gouvernement
uruguayen ne sait pas comment fonctionne cette usine et il n’arrive pas à obtenir l’information de la
société Botnia. C’est pourquoi les avocats urugua yens se trouvent si souvent ici en mauvaise
posture, par exemple sur la question des nonylphénols.
39. Monsieur le président, il est évident que l’usine Botnia cause une pollution nocive. Le
professeur Colombo a produit des preuves écrasantes du fait que la prolifération des algues a été
causée par l’usine. L’Uruguay n’a rien à dire ⎯ pas un mot ⎯ sur la présence dans les floraisons
d’algues de fibres d’eucalyptus, de nonylphénols et de coliformes associés aux usines de pâte à
papier. L’Uruguay n’a rien à dire non plus sur la présence de cellules en nombres dépassant
considérablement les normes de la CARU. Et les explications données par l’Uruguay lui-même sur
la source de la floraison d’algues ont été démontées point par point: l’Uruguay n’a pas tenu
compte des questions d’inversion du courant ; il n’a pas compris les données ; il ne savait rien des
inversions de courant, apparaît-il maintenant, et, s’il savait, il n’a pas communiqué l’information à
ses propres conseils ou à la SFI; il s’est trompé sur la direction des vents; il a sous-estimé le
nombre des épisodes graves d’odeurs; nous apprenon s aujourd’hui qu’il n’est même pas capable
d’interpréter correctement des données satellite; il voit de la chlorophylle là où il y a des
sédiments. Ce sont là des défaillances plutôt graves pour un Etat, et on a bien l’impression qu’elles
dénotent une difficulté foncière à saisir les questions scientifiques et techniques.
41 El País , 1s6eptembr2e009 (consultable à l’adre sse http://www.elpais.com.uy/090916/pnacio-
442324/politica/argentina-turismo-y-las-pasteras-son-incompatibles) . - 27 -
34 40. Monsieur le président, vous n’avez pas à franchir le pas de l’application du droit de
l’Union européenne. Je vous ai donné les preuves les plus évidentes du fait que l’usine utilise et
rejette des polluants nocifs qui ont entraîné des violations, ou la poursuite et l’aggravation de
violations, des normes de la CARU. C’est le cas en ce qui concerne l’oxygène dissous, les
substances phénoliques et à l’occasion aussi les algues. C’est également le cas pour le phosphore,
au regard des normes de l’Uruguay. Je pourrais donner beaucoup d’autres exemples. Si nous
faisons nôtre l’approche de M. Boyle, c’est tout ce que nous avons à montrer pour vous convaincre
de notre argumentation sur l’article41, et nous l’avons montré clairement. Les preuves sont
incontournables. Reprenons la fo rmule de M.Boyle en la retour nant: «[O]n peut présumer que
l’eau qui ne satisfait pas aux normes de la CARU est polluée et que les rejets d’effluents qui
entraînent un dépassement de ce taux sont nocifs pour le milieu aquatique.» 42 Ces rejets, ces
violations des normes de la CARU , de celles de l’Uruguay et de ce lles de l’Union européenne, et
les conséquences de ces violations, à savoir la pr olifération d’algues et la diminution du niveau
d’oxygène, produisent aussi les modifications écologiques que l’article36 fait obligation à
l’Uruguay d’éviter absolument.
V. Conclusions
41. Monsieur le président, Messieurs de la Cour, j’en arrive ainsi à ma conclusion.
L’Uruguay a beaucoup insisté sur le libre exercice de son droit de souveraineté. Mais ce droit n’est
pas absolu. Nous ne pouvons pas dire mieux que le tribunal arbitral chargé de l’affaire Rhin de fer,
lequel a jugé qu’un Etat «peut exercer sa souvera ineté…sauf si cela entre en conflit avec…les
droits concédés en vertu [d’un] traité» 43. Dans la présente espèce, ces droits découlant d’un traité
sont ceux inscrits dans le statut de1975, et ils co mprennent le droit de l’Argentine de ne pas être
soumise à la pollution en violation de l’article 41, et le droit d’exiger que l’Uruguay se conforme à
son obligation d’agir en coordination avec la commission pour éviter «une modification de
l’équilibre écologique». Comme il a été fort justement écrit, la Cour a rejeté l’argument selon
lequel «les obligations assumées au titre d’un traité valablement conclu ne peuvent plus être
42
CR 2009/18, p. 13-14, par. 7.
43 Arbitrage relatif à la ligne ferroviaire du Rhin de fe(«Ijzeren Rijn») (Belgique/Pays-Bas), sentence
du 24 mai 2005, La Haye, chap. V, par. 160. - 28 -
respectées parce qu’elles se sont révélées gênantes» ( Projet Gab číkovo-Nagymaros
(Hongrie/Slovaquie), arrêt, C.I.J.Recueil1997 , opinion séparée de M.le juge Koroma, p.144).
Les obligations procédurales que nous disons avoir été violées ne constituent pas une fin en soi:
35 elles sont un moyen de garantir l’exécution, entre autres engagements, de ceux qu’énoncent ces
deux articles et, bien entendu, de garantir «l’utili sation rationnelle et optimal e» du fleuve. Si ces
obligations avaient été respectées, des problèmes comme ceux qui ont tellement mis en difficulté
l’Uruguay ⎯ l’ampleur de l’inversion du courant, la violation des normes de la CARU ⎯ auraient
sans doute pu être évités. Le fait que ces obligations n’aient pas été respectées ne peut rien changer
à la validité et à l’effet des articles 36 et 41.
42. Monsieur le président, nous sommes t ous conscients aujourd’hui de l’importance
singulière de cette affaire, au cŒur de laquelle se trouve la san té d’un fleuve important. La
tendance des avocats de l’Uruguay à vouloir tr op prouver les a placés dans une situation
extrêmement difficile. Pendant cinq ans, l’Uruguay s’est fondé sur l’idée que l’inversion de
courant était rare. Depuis la semaine dernière, il voudrait vous faire croire qu’il est parti d’une
autre hypothèse, mais l’argumentation qu’il a développée indique le contraire. «Il n’y a qu’une
chose au monde qui soit pire que d’être celui dont to ut le monde parle, c’est d’être celui dont on ne
parle pas», a dit ⎯à peu près ⎯ OscarWilde ⎯et l’Uruguay n’a jamais parlé de 29%
d’inversion du courant. Il n’a purement et simplement pas tenu compte de ce facteur, et cette
omission signifie qu’il s’est mis en infraction aux articles36 et 41. Elle signifie aussi que les
effluents de Botnia ont été transportés vers l’ amont où ils s’accumulent maintenant : le phosphore
et les substances phénoliques ⎯ bien au-delà des limites fixées ⎯, la chute des niveaux d’oxygène
dissous. Il y a quelques mois, les rejets polluan ts de Botnia ont provoqué une floraison d’algues
toxiques massive et sans précédent. Il ressort du dossier que l’usine rejette ⎯ce n’est pas
nouveau ⎯ des nonylphénols interdits. Il n’y a auc un doute dans notre esprit, pas le moindre
doute, sur le fait que les articles 36 et 41 ont été violés et qu’ils continuent d’être violés
quotidiennement. Pour que ces dis positions ne soient pas lettre morte, il incombe à la Cour de
céans de faire cesser les rejets, du moins sur ce site. C’est une responsabilité historique, mais qui - 29 -
n’appelle pas la Cour à faire plus que ce que prescrit la loi uruguayenne elle-même , à savoir faire
cesser tous les rejets provenant de cette usine dans ce tronçon du fleuve. Cette responsabilité
historique vous incombe aujourd’hui, Monsieur le président et Messieurs de la Cour : vous pouvez
laisser les rejets se poursuivre, avec tous les domm ages qui vont s’ensuivre, nous dit-on, ou vous
pouvez y mettre fin.
36 43. Monsieur le président, Messieurs de la Cour, ainsi se termine mon exposé de ce matin.
Avant de conclure, je voudrais remercier tous les membres de l’équipe de l’Argentine pour l’aide
considérable qu’ils m’ont apportée ces trois dern ières années, sur des questions scientifiques et
techniques en particulier, mais aussi sur des questions juridiques, et remercier aussi mon excellente
collègue KateCook de tout le tr avail qu’elle a fourni depuis trois ans. Je vous remercie une
nouvelle fois de votre aimable attention, et vous invite à appeler à la barre M. Marcello Kohen.
Le VICE-PRESIDENT, faisant fonction de prési dent: Je remercie M.Sands de son exposé
and I now give the floor to Professor Kohen to begin his oral pleading.
KOrH. EN:
VI. U RUGUAY ’S ATTEMPTS TO BYPASS THE
S TATUTE MUST BE REJECTED
1. Mr.President, Members of the Court: After many twists and turns, Uruguay has at last
chosen its position in regard to Article7. The Respondent has finally had to acknowledge that it
did not act in accordance with the article. The R espondent’s argument is now limited to citing the
existence of so-called agreements with a twofol d purpose, to bypass the procedural provisions of
the Statute and to build the mills.
2. It is regrettable to see that, whatever Uruguay might say, in order to justify this line of
argument it has engaged in an exercise of gutting CA RU’s role in the system set in place under the
44Voir DINAMA, rapport d’évaluation des impacts sur l’e nvironnement relatif à l’usine Botnia, 11 février 2005,
CMU, vol. II, annexe 20, par. 8, conclusions et recommandations, p.33: mise en Œuvre du projet ne devrait
produire, à aucun lieu de la rive situé en aval des effluents ni dans la pompe d’eau brute de l’OSE, des valeurs dépassant
celles fixées dans le tableau suivant concernant les pade qualité de l’eau.» (Les italiques sont de moi.) La
concentration de 0,5mg/l fixée pour les substances phénoliques, est aujourd’hui très largement dépassée. Le document
poursuit ainsi :
«Au cas où le rejet d’effluents émanant du projet aurait pour effet que les valeurs des paramètres
indiquant la qualité de l’eau dépassenlimites fixées dans le tableau précéle demandeur ne
pourra poursuivre les rejets après avoir extrait du corps récepteur un montant équivalent au
dépassement concerné.» (Les italiques sont de moi.) - 30 -
45
Statute of the River Uruguay , as if CARU were an empty shell that did no more than receive and
relay messages between the Parties.
3. Mr. Martin has claimed that “the joint decision to bypass CARU was not a violation of the
Statute” 46. ProfessorCondorelli, also working from th is false premise, has made a spectacular
procedural leap and arrived directly at Article 12, arguing that, as a result, it would be pointless “to
37 reopen the matter of the obligations which the States ought to have fulfilled vis-à-vis CARU” 47.
This is a scarcely veiled way of recognizing that Uruguay failed to abide by the procedure leading
up to Article 12.
4. This morning I am going to show you that the agreements which the Respondent is trying
to cite do not at all have the significance being ascribed to them, that there has never been an
agreement to bypass CARU and that Argentina has never agreed to the construction of the ENCE
and Botnia mills. Moreover, in the case of the Botnia mill, any claimed agreement of the sort being
alleged by Uruguay would be materially impossible. In short, Uruguay cannot escape the fact that
it has flagrantly breached Article 7 et seq. of the Statute.
5. Last week, we witnessed the Respondent enga ging in considerable efforts to scramble the
facts. Uruguay selectively quoted from a number of documents, whilst ignori ng others of crucial
significance. In this pleading, I shall re-estab lish the facts as the background to the case shows
them to exist. Each time, I shall “examine [the] actual conten t [of the documents] as well as the
circumstances in which [they were adopted]” (Armed Activities on the Territory of the Congo (New
Application:2002) (Democratic Republic of the Congo v. Rwanda) , Preliminary Objections ,
48
Judgment, I.C.J. Reports 2006 , para.49) . Mr.President, following your instructions, I shall
refrain from going back over points that we made during the first round of pleadings, and on which
Uruguay has remained eloquently silent. Those points remain entirely relevant, to be sure; but I
shall limit myself to refuting the arguments that our opponents put forward last week.
45
CR 2009/18, pp. 39-48, paras. 13-40 (McCaffrey); CR 2009/18, pp. 49-55, paras. 3-22 (Martin).
46
CR 2009/18, p. 49, para. 2 (Martin).
47CR 2009/19, p. 14, para. 6, and pp. 21-22, para. 20 (Condorelli).
48Nuclear Tests (Australia v. France), Judgment, I.C.J. Reports 1974, pp.269-270, para.5Frontier Dispute
(Burkina Faso/Republic of Mali), Judgment, I.C.J. Reports 1986, pp. 573-574, paras. 39-40. - 31 -
6. The situation is simple. Briefly, on one hand there is a State which decided not to follow
the procedure laid down in the Statute, while on the other hand there is a State demanding that
CARU be notified so that the procedure which the two States had established by agreement could
commence. From the outset, CARU acted as it was supposed to. Both for the ENCE mill and for
the Botnia mill, it officially asked Uruguay to provide the required in formation before the
corresponding authorizations were issued 49. But Uruguay did not reply. On the contrary, Uruguay
38 issued authorizations without following the pro cedure laid down in the Statute. Each time,
50
Argentina protested . This is how the dispute came about, and how it has got worse each time that
Uruguay decided to issue a new authorization without complying with Article 7.
7. The aim of the agreements in 2004 and 2005 was to stop Uruguay acting unilaterally and
bring it back into compliance with the Statute, not to exonerate it of its viol ations. I shall now look
at those agreements one by one.
A. The purpose of the agreement of 2 March 2004 was
to bring Uruguay back to CARU
8. First, let us turn to the agreement of 2 March 2004. Contrary to what Mr. Martin said on
Wednesday, Mr.President, I do not see any reason at all why the Court should not be shown the
content of that agreement. Unlike Mr. Martin, howev er, I am going to show the text in its entirety,
without skipping over the first step agreed in it. We have noted that our opponents are wont to
avoid going through all steps. I shall use the valid text of the agreement, as recorded in the minutes
51
of the CARU meeting held on 15 May 2004 .
9. [Slide 1 on.] Here it is on the screen, and you can also find it at tab 6 in your folders. Did
52
the Parties really want to bypass CARU, as Mr. Martin said ? Why then does the joint text of the
agreement of 2March2004 appear only in the mi nutes of the extraordinary meeting of CARU,
marking the end of the Commission’s paralysis? This proves that the agreement was aimed at
49
ENCE: Note SET-10413-UR of 17October2002, MA , Vol.III, Ann.12; NoteSET-10617-UR of
21April2003, MA, Vol. III, Ann. 16; Note SET-10706-UR of 15August2003, MA, Vol.III, Ann.18; Botnia: Note
SET-11037-UR of 16 November 2004, MA, Vol. III, Ann. 36.
50CARU, Minutes 11/03, extraordinary meeting of 17 Oct ober 2003, MA, Vol. III, Ann. 5; Note MREU 226/03
of 27October2003, MA, Vol.II, Ann.20; CARU, Minutes 3/05, meeting of 11March2005, pp.7-11, point3.4, MA,
Vol. III, Ann. 31.
51CARU, Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24, pp. 169-170. Judges’ folder, 29 Sep. 2009, tab 6.
52CR 2009/18, pp. 57-59, paras. 30-36 (Martin). - 32 -
re-introducing the ENCE project within CARU, and not the contrary. And not just for a monitoring
plan, as Uruguay claims 53. Members of the Court, what does this agreement say as point No.1?
39 Look. It says that Uruguay shall communicate the information relating to the construction of the
54
pulp mill . [Slide1 off. Slide2 on.] And what do we find in the CARU minutes immediately
after the description of the agreement of 2 March? A decision, concerned precisely with applying
the ministerial agreement and requiring Uruguay to relay that information to CARU through its
delegation. That information was then to be studied by CARU before being approved: CARU
would make proposals, which Uruguay would have to examine with the company. And once that
procedure had been completed, CARU would once again be informed by Uruguay 55!
10. Rather than bypassing CARU, as Uruguay claims, the agreement of 2March in fact
strengthened the role of CARU. [Slide 2 off. S lide 3 on.] Indeed, Mr. President, Members of the
Court, CARU’s standard procedure, which you see illu strated in the table on the screen, is far from
56
limiting its role as a bi-national organization to that of a mere “postal agent” . [Slide 3 off.]
11. So there you have the actual content of the agreement of 2 March, as reflected in the only
official joint text of the two Parties. An internal memorandum prepared by a Uruguayan diplomat,
of which of course Argentina had no knowledge, or statements attributed by the press to an
Argentine diplomat, cited by Mr. Martin 57, cannot in any case be a substitute for the minutes of the
CARU meeting, which alone can be authoritative. Moreover, if counsel for Uruguay truly wanted
40 to know how the Argentine co-author of the agreem ent interpreted it, he c ould have looked at this
5CR 2009/18, p. 59, para. 36 (Martin).
5“On 2 March 2004 the Foreign Ministers of Argentina and Uruguay arrived at an agreement with respect to the
proper course of action on the topic, namely, the Uruguayan government shall provide the information related to the
construction of the pulp mill, and in relation to the operational phase of the pulp mill, CARU shall carry out the
monitoring of water quality in compliance with its Statute.” (CARU, Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24,
p. 170). [Translation by the Registry.])
5“Both delegations reasserted thatthe Foreign Ministers of the Republic of Argentina and the Republic of
Uruguay agreed on 2 March 2004 that Uruguay shall communicate the information related to the construction of the pulp
mill including the Environmental Management Plan. In this sense, CARU shall receive the Environmental Management
Plans for the construction and operation of the pulp mill provided by the company to the Uruguayan government via the
Uruguayan delegation. Within the framework of its competency, CARU will consider those, taking into account the terms
included in the aforementioned Ministerial Resolution342/2003,particularly those terms expressly established by the
Ministry of Housing, Land Use Planning and the Environment, such as actions which require additional implementation
and assessment by the company before approval of those, formulating its observations, comments and suggestions, which
shall be transmitted to Uruguay, to be dismissed or decided with the company. Once said issues are considered, CARU
shall be again informed.” (CARU, Minutes 1/04 (15 May 2004), MA, Vol. III, Ann. 24, pp. 170-171. [Translation by the
Registry.])
5MA, p. 55, fig. 2. Judges’ folder, 29 Sep. 2009, tab 7.
5CR 2009/18, p. 57, para. 30 (Martin). - 33 -
statement, which Argentina’s Minister of Fore ign Affairs made before the Foreign Affairs
Committee of the Argentine Chamber of Deputies on 14 April 2004 [slide 4 on]:
“With regard to M’Bopicuá [the ENCE mill], the agreement we have entered
into with Uruguay will have three stages. The first stage ends with the approval of the
works. This stage involves a specific body, the Administrative Commission of the
River Uruguay (CARU), and here Argentina will receive all the information from
58
Uruguay.”
[Slide 4 off.]
12. It is true that the agreement refers to a second phase, the operational phase, which is the
only phase which drew the attention of Uruguay’s counsel. But to mention an operational phase
does not mean that approval to proceed with su ch a phase has been given in advance. Any
interpretation to the contrary would deprive the first phase of all meaning, that is, the provision that
the information provided by Uruguay had to be examined by CARU and by Argentina. And this
applies a fortiori for the third phase, that of the additional monitoring measures if the project was
approved. Now Mr. President — and when I say “now” I really mean a huge “but” — the Parties
never reached those subsequent stages beca use Uruguay never transmitted to CARU the
information required under the first phase, with th e result that CARU was never able to carry out
the actions agreed upon at the extraordinary meeting of 15 May 2004.
13. Thus there was no further information provided, there was no possibility for the
subcommittee to carry out studies, there was no po ssibility for CARU to make a determination,
there was no possibility for CARU’s opinion to be sent to Uruguay, there was no subsequent
submission by Uruguay to CARU and there wa s no decision by CARU opening the way for the
remaining steps in the procedure to go ahead.
14. Using the few arguments at their disposal, our opponents have tried to justify their
behaviour. They want to make us believe that envisaging the possibility of building and
commissioning a plant automatically means that such building and commissioning have been
agreed to in advance. But all of that, Mr. Presi dent, has to come about as the result of a study, an
assessment and a decision! By definition, each step is contingent upon the completion of the
5Minutes of the meeting of Argentina’s Minister of Fo reign Affairs with the Foreign Affairs Committee of the
Chamber of Deputies, Buenos Aire s, 14April2004. MA, para.2.30;MA, Vol.VII, Ann.11. [Translation by the
Registry.] - 34 -
previous stage. Since Uruguay did not permit the first stage to be completed, it cannot claim to
place Argentina at the second stage.
41 15. Clearly, there was not the slightest hint of an agreement to bypass CARU. Neither can
the agreement be interpreted as prior acceptance by Argentina that the plant would be built, which
would imply that Argentina had no concern as to the outcome of the examination of the
information to be provided. That would be contra ry to the very goal of a project assessment.
Allow me, Mr.President, to make a comparison w ith the world of academia. The fact that the
Regulations of our Graduate Institute lay down a series of steps for obtaining a diploma does not in
any way mean that we have already agreed that all our students will receive a diploma regardless of
what they do, or that we already know in advance that they will do brilliant examinations and write
first-rate research papers.
16. But let us return to the River Uruguay, Mr .President, or rather to its Statute and the
agreement of 2March which was simply a pr ocedure for implementing it. There was a
requirement that the information be transmitte d to CARU, and there was a requirement for
“approval of the works”. With the agreement of 2 Ma rch, we were still at the stage of Article 7 of
the Statute. And it is Uruguay that decided not to complete that first stage. All through 2004,
Argentina’s Foreign Minister, Mr.Bielsa, reminded his Argentine counterpart, Mr.Opertti, of the
commitment that Uruguay had made. He did it in July at a MERCOSUR summit meeting, in
August at a meeting of the Río Group and in Novemb er at the Ibero-American summit in San José,
59
Costa Rica . Uruguay, in the person of its Foreign Minister at that time, did not keep its word.
And I would remind you — and on this point there is no disagreement between the Parties — that
60
all through 2004 and the first quarter of 2005 ENCE had not begun construction of its plant .
17. So there is nothing in Argentina’s behaviour to reproach. And there is no basis on which
to infer that Argentina accepted anything. Th ere was an agreement, CARU was waiting for
information it was to receive from Uruguay, work had not begun and Uruguay did nothing.
18. Counsel for Uruguay made reference to the documentation that Uruguay transmitted to
59
Affidavit of Mr. Rafael Bielsa, 26 Nov. 2007, RA, Vol. II, Ann. 42. Judges’ folder, 29 Sep. 2009, tab 8.
60
CR 2006/47, p. 46, para. 13 (Reichler). - 35 -
61
Argentina in October and November of 2003 . He could have seen that, although Argentina’s
42 protest made specific mention of Article 7 of the Statute, Uruguay justified the transmission of that
information only on the basis of “the spirit.. . of co-operation and good neighbourly relations”,
62
wholly ignoring the application of the Statute . Mr.Martin claimed that Uruguay could not
transmit the information on the ENCE mill to CARU because at the time CARU was “paralysed” 63.
But the reason for that paralysis was Uruguay’s refusal to accept CARU’s jurisdiction regarding the
ENCE project! The paralysis was by Uruguay’s intent, not as a result of some incapacity on the
part of CARU. Clearly, Uruguay had every opportunity to transmit the information: it simply
chose not to. A clear example in this regard is the fact that during the period of so-called paralysis,
in February2004, it was Argentina that transm itted to CARU the information received on the
64
project from ENCE, and asked that it be relayed to the corresponding subcommittee for study .
Counsel for the Respondent could perhaps explain to us on Thursday or Friday why Uruguay was
unable to do likewise.
19. Mr. Martin then claimed that a mere inte rnal report by two Argentine technical advisers,
mentioned in a response by the Chief of the Cabinet Office in February 2004 to a question asked by
a legislator, could be considered equivalent to a l ack of objection to the project by Argentina in the
sense of Article 9 of the Statute 65! This was a particularly rash statement on the part of Uruguayan
counsel, and the fact that he used the conditional shows he knew it. Let us look at the actual facts.
20. We are in February2004 and these technical consultants, acting as individuals and
expressing their own personal opinions, made an initial comment based on the information then
available — which, as we know, was not sufficient, for otherwise the March 2004 agreement would
not have included the requirement that additional information be provided. But if Argentina had
been satisfied with the opinion of its consultants, why did it, at exactly the same, time ask CARU to
transmit the information to the corresponding subc ommittee for evaluation, in order to determine
61
CR 2009/18, pp. 55-56, para. 25 (Martin).
62
MA, Vol. II, Ann. 21; CMU, Vol. III, Ann. 55.
6CR 2009/18, p. 55, para. 24 (Martin).
6Note from the Chairman of the Argentine delegation to the Chairman of CARU dated 23February2004,
reproduced in CARU Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24. Judges’ folder, 29 Sep. 2009, tab 6.
6CR 2009/18, pp. 56-57, paras. 26-29 (Martin), - 36 -
43 whether the project might affect water quality, while making specific reference to Article 7 of the
Statute 66? No, Members of the Court, we are very far from any sort of approval whatever by
Argentina, and the vain attempts by our opponents to place you at a later stage in the procedure are
without merit. This applies equally in so far as the opinion of one of Argentina’s delegates is
concerned, for once again he was expressing a view solely on the basis of information available up
67
to that point .
21. Mr. President, counsel for Uruguay could have read the minutes of the CARU meeting of
15May2004 more carefully. He would have f ound, for example, that the Chairman of the
Argentine delegation reread the note of 23Februa ry2004 in which he entered a reservation with
respect to Article7, and insisted that the documentation was not complete and that CARU had to
68
fulfil its functions . He could have seen that the Argentine delegate, Mr. Rodríguez, after pointing
out the negative impact of such a plant for Ñandu baysal and for the river overall, recalled that
Argentina had protested at the failure to comply with the consultation mechanism laid down in
Article7 of the Statute 69, and that another Argentine dele gate, Mr.Rojas, underscored the
fundamental character of Article7 et seq., whilst affirming the need to take account of “other
development alternatives whic h could be affected during th e construction and subsequent
commissioning of Celulosas de M’Bopicuá [ENCE]” 70.
22. Counsel for our opponents might also have noted [slide5 on] that Mr.Cardoso, the
Uruguayan delegate, while commending the rapproche ment between the two ministries’ positions,
felt, after hearing the divergence of views between the two delegations on technical issues relating
to the project, that the agreement “will help resolve the dispute” (“facilitará el camino para superar
la controversia”) 71, if you will allow me, Mr. President, to quote a few words in my mother tongue.
[Slide 5 off.]
6Note from the Chairman of the Argentine delegation to the Chairman of CARU dated 23February2004,
reproduced in CARU Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24 pp. 147-148.
67
CR 2009/18, pp. 56-57, para. 28 (Martin).
68
CARU, Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24, pp. 147-148 and 153. Judges’ folder, 29 Sep. 2009,
tab 6.
69
CARU, Minutes 1/04, 15 May 2004, MA, Vol. III, Ann. 24, pp. 161-164. Judges’ folder, 29 Sep. 2009, tab 6.
7Ibid., pp. 164-165. Judges’ folder, 29 Sep. 2009, tab 6.
7Ibid., p. 167; emphasis supplied. Judges’ folder, 29 Sep. 2009, tab 6. - 37 -
44 23. All of this is conclusive, Mr.Preside nt: the agreement of 2March2004 ended the
dispute as to whether or not CARU was the forum where the ENCE project was to be evaluated,
but did not put an end to the dispute over the project itself.
The VICE-PRESIDENT, Acting President: Professor Kohen, I believe this is an appropriate
point to interrupt your presentation so that the Court can take a break. L’audience est suspendue
pour dix minutes.
L’audience est suspendue de 11 h 30 à 11 h 40.
The VICE-PRESIDENT, Acting President: Please be seated. The sitting is resumed and I
would ask Professor Kohen to continue. You have the floor, Sir.
Mr. KOHEN: Thank you, Mr. President.
B. It is materially impossible for Argentina to have approved the
Botnia mill construction project
24. I shall turn now to the issue which, it seems to me, is the issue where Uruguay’s
advocates and counsel have shown the greatest imagination, namely, the claim that Uruguay “did
not violate Article7” with respect to Botnia and that Argentina accepted the construction of the
mill72. They do not assert that Uruguay fulfilled its ob ligations under Article7, but rather that
Uruguay “did not violate” that provision. Here, Uruguayan counsel have done two things: they
have extended the agreement of 2March2004 to the Botnia mill and they have invoked the
agreement of May2005 setting up the GTAN. Ne ither of the two agreements permits this
conclusion to be reached 73.
25. In essence, the argument put forward by th e Respondent to claim that Argentina agreed
to the construction of the Botnia plant is a grammatical one. It is that the plural form “mills” with a
74
final “-s” is used in a number of Argentine documents and is reflecte d in the name “PROCEL” .
45 On the latter point, in the first-round pleadings we showed that this cannot be construed as
7CR 2009/18, pp. 47-48, paras. 38-40 (McCaffrey); CR 2009/18, pp. 60-63, paras. 40-49 (Martin).
73
CR 2009/14, pp. 14-17, paras. 11-19; p. 19, para. 24 (Kohen).
7CR 2009/18, pp. 60-61, paras. 42-44 (Martin). - 38 -
constituting acceptance of the construction of th e mills, and I respectfully refer you to our
75
arguments at that time .
26. Let us return to the plural form “m ills” which Uruguay has found in some documents.
Mr. President, if it is a case of extending the agreement of 2 March 2004 to the Botnia mill, this is a
pointless exercise for Uruguay. We have already seen the true scope of that agreement, which
imposed the obligation to submit any industrial plan on such a scale to the prior consultation
procedure within CARU. If Uruguay had applied that agreement, it would have had to submit the
Botnia project to CARU. I would say that, by issuing the authorization to Botnia on
14 February 2005, Uruguay unfortunately put an end to that agreement because it reverted to the
situation which had existed prior to the agreement and had given rise to it.
27. But let us suppose for a moment, for the sake of argument, that our Uruguayan friends
are correctly interpreting the 2March2004 agreement, and that that agreement put an end to the
dispute over the construction and commissioning of the ENCE mill. The documents which contain
the term “mills” in the plural all date from a time prior to the date when Argentina learned of the
76
authorization issued by the Uruguayan Government on 14January2005 . At that point, there
could be no dispute over the Botnia mill because Uruguay had not yet authorized construction of
the mill without first following the procedure established in the Statute. Members of the Court,
how can one put an end to a dispute that does not yet exist?
28. Mr.President, it is purely and simply impossible for Argentina to have accepted the
construction of the Botnia plant as Uruguay claims . In essence, the Respondent is putting forward
a thesis under which Argentina accepted the construc tion of the Botnia plant without even having
received all the information about it. And that is not all! They woul d have you believe that
Argentina did that before Uruguay itself had decided it would be built!
29. A few moments ago, I spoke to you of my students and the Regulations of our Graduate
Institute. In fact, I had in mind students who have already registered with the Institute. If I may
pursue the analogy, Mr.President, Uruguay’s interp retation in regard to the Botnia plant would
46
mean that I would have to be careful with our potential students because sometimes they get in
75
CR 2009/14, p. 17, para. 17 (Kohen); CR 2009/15, pp. 41-43, paras. 13-17 (Müller).
76
See CARU, Minutes 08/04, 12 Nov. 2004, MA, Vol. III, Ann. 28; CMU, Vol. IV, Ann. 108. - 39 -
touch with me even before applying to the univers ity. And if they follow Uruguay’s thesis, I fear
they will come and ask us for their diploma tomorrow, before they have even submitted their
application papers!
C. Uruguay acknowledges that it did not comply with the procedure
set forth in the 1975 Statute
30. Members of the Court, at this stage it b ecomes clear that the facts are very different from
what Uruguay claims. From the moment Arge ntina heard rumours in the press about the
construction of the Botnia plant being authorized, it brought it to CARU’s attention that such an
77
authorization would be contrary to Article 7 of the Statute . Once the rumours were found to be
true, Argentina protested within CARU and pointed out that the obligation in that regard had been
78
breached . Each time, there was no reaction from Uruguay. Or rather, there was a reaction once,
precisely to confirm Argentina’s thesis.
31. Indeed, what happened at the CARU mee ting of 6May2005 is critically important in
illustrating the Parties’ respective attitudes, not only in regard to the Botnia mill but also to the
procedure as a whole.
32. For this reason I would ask you to bear with a long quotation from the Chairman of the
Argentine delegation [slide 6 on]:
“However, we must mention that the prior consultation mechanism was not
observed, and this is serious. The CARU has sent Notes to the relevant Uruguayan
bodies, and the Argentine Delegation expresse s its appreciation for such steps and
requests additional data on the installation of the M’Bopicuá undertaking, and on
Botnia. We regret not having received an answer. We regret to see that the
consultation system provided for in the Statute of the River Uruguay is not being
implemented and that the CARU cannot benef it from such system. It is the intention
of our Delegation to raise the issue once again, as it significantly affects several
communities on the Argentine coastline of the River Uruguay, and it is obvious that
the Uruguayan coastline will also suffer from such effects. It is obvious that breach of
the Statute as regards the prior consultati on system (Art.7 and following ones) is a
very serious matter. It is obvious that s hould such situation continue, the procedures
provided for in the Statute for settling disputes concerning the application of the rules
provided for therein must be triggered. I wish to point out that we make a reservation
of rights in this regard. We once again request the Uruguayan Delegation to comply
47 with the prior consultation system as regard s BotniaS.A. so that the CARU and the
Argentine Delegation in particular, can analyse whether the projected works involve
77
CARU, Minutes 3/05, 11 Mar. 2005, MA, Vol. III, Ann. 31. Judges’ folder, 29 Sep. 2009, tab 9.
78
CARU, Minutes 5/05, 6 May 2005, MA, Vol. III, Ann. 32. Judges’ folder, 29 Sep. 2009, tab 10. - 40 -
environmental effects that79equire correc tive measures in accordan ce with the Statute
of the River Uruguay.” [Slide 6 off.]
33. That is perfectly clear. And the respon se from the President of the Uruguayan delegation
is likewise free of any ambiguity [slide 7 on]: “[t]he facts have occurred as
Mr. Ambassador [Roberto García Moritán, President of the Argentine Delegation] has explained 80”
[slide 7 off].
34. Thus, through the Chairman of its delega tion to the competent bi-national organization,
Uruguay acknowledged that it had not transmitted the information to CARU or followed the prior
consultation system before the commencement of construction, in spite of CARU’s requests and
the requirements spelled out in the 1975 Statute.
D. The GTAN in no way exonerated Uruguay of its wrongful behaviour
35. I move on now to the thesis advanced in particular by ProfessorLuigiCondorelli,
according to which setting up the GTAN meant th at Uruguay was exonerated of its unlawful
behaviour. The idea here is that the two Governments decided to discuss the matter of the pulp
mills at a higher level than CARU 81.
36. I would begin by placing the establishment of the GTAN within its chronological
context. At the beginning of March 2005, the new government of President Tabaré Vázquez took
office in Uruguay. As I have previously mentioned, the former government issued the
48 authorization to Botnia two weeks before it left office, without informing Argentina of that
authorization. [Slide8 on.] According to Uruguay’s outgoing Vice-President, LuisHierro, when
running as a candidate Mr.Vázquez had promised the Argentine President all through 2004 that
Uruguay would not authorize the construction of the pulp mills 82. [Slide 8 off.] But it was also at
this time in 2005 that site preparation work for the ENCE mill and site preparation and construction
83
work for the Botnia mill began .
79Ibid. [Translation by the Registry.]
80
Ibid. [Translation by the Registry.]
81
CR 2009/18, p. 45, para. 31 (McCaffrey); CR 2009/19, p. 23, para. 23 (Condorelli).
82“Hierro criticized Uruguay’s foreign policy”, El Espectador, Montevideo, 2June2009 (New documents
submitted by Argentina, 30 June 2009, press articles). Judges’ folder, 29 Sep. 2009, tab 11.
83MA, para. 2.62; CMU, paras. 1.39 and 3.116; RA, para. 2.28. - 41 -
37. Professor Condorelli referred to a claimed “i mpasse in CARU” at th e time as the reason
why the GTAN was set up 84. Members of the Court, it was nothing of the sort. He must have been
mistaken, and been thinking of the situation that existed from November 2003 to May 2004. In the
first half of 2005, CARU was functioning normally. The proof can be seen in the meetings held in
March and May 2005, at which Argentina outlined before CARU Uruguay’s failure to comply with
its obligations under Articles 7 et seq. in regard to the Botnia mill, meetings which my friend on the
other side breezily ignored.
38. For his part, Mr.Martin makes a great fuss over the note sent by the Argentine
ForeignMinister, Mr.Bielsa, to his Uruguayan counterpart, Mr.Gargano, on 5May2005 85. It is
unfortunate that counsel looked only at the Ur uguayan translation of that note, which does not
86
include a key passage . He could have looked either at the original text in Spanish or at the
complete translation provided by Ar gentina. I quoted the note last week 87. And I even put up on
the screen the part of the note that our opponents seem to ignore. With your indulgence,
Mr. President, I am going to put it on the screen again. [Slide 9 on.]
39. As you can see, this note asks
(a) that consideration be given to relocating the pulp mills,
(b) that further information be provided about them, and
49 (c) that the status quo be maintained for 180days so that cumulative environmental impact
assessments can be produced 88.
[Slide 9 off.]
40. Members of the Court, I do not see what more Argentina could be expected to do to
assert its rights. On 5 May, it asks, at the ministerial level, for work to be suspended for six months
and for the two other conditions you have just seen on the screen to be met. On 6 May, Argentina
draws CARU’s attention to the fact that Uruguay has not complied with Article 7, and warns that,
84
CR 2009/19, p. 13, para. 4 (Condorelli).
85
CR 2009/18, pp. 61-62, para. 46 (Martin).
8RU, Vol. II, Ann. R15. Judges’ folder, 29 Sep. 2009, tab 12.
8CR 2009/14, p. 19, para. 24 (Kohen).
8Note from the Minister of Foreign Affairs of the Argentin e Republic to the Minister of Foreign Affairs of the
Eastern Republic of Uruguay, 5 May 2005, MA, Vol. II, Ann. 22. Judges’ folder, 29 Sep. 2009, tab 12. - 42 -
if Uruguay remains in non-compliance with the pr ocedure, the dispute-settlement mechanism laid
down by the Statute will have to be set in train — which moreover is a reference to Article 60 and
not Article 12. This is conclusive, and there is no ambiguity in it, Mr. President.
41. I shall now move on to the press release of 31May concerning the GTAN. As
Professor Condorelli has said, it was the two Presidents who decided to set up this technical group
on 5May 89. As I have just shown you, Argentina protested to CARU the very next day over the
violation of Article 7 by the authorization issued to Botnia. This is overwhelming evidence that the
setting up of the GTAN did not represent a bypassing of CARU and it did not mean — by whatever
miracle of diplomatic acrobatics I cannot fathom — that the Parties had wound up at Article 12 of
the Statute, as counsel for the Respondent subsequently claimed 90.
42. The same counsel for Uruguay also devoted several minutes to elucidating the phrase
“the cellulose plants, that are being constructe d” found in the press release. There should be
nothing surprising in the use of this expression, for the work had in fact begun. I leave it to my
friend and opponent, Luigi Condorelli, to put it in whatever way he wishes in French; but that does
not change anything. It is a statement of fact. A fact to which Argentina swiftly objected. Without
91
any basis, counsel for Uruguay speaks of “an accepted fact” , a claim that does little to disguise
Uruguay’s continued attempt to impose a fait accompli. It is accurate to say, Mr.President, that
50 construction work had already begun in May 2005. I have shown that Argentina did not accept that
fact, and asked that work cease. And I would su ggest the Respondent try to make its story a bit
more consistent: after pointing out that construction work on the mills was already under way in
May2005, Uruguay should no longer try to tell us that construction authorization for the Botnia
92
mill was not issued until January 2006 !
43. In short, Uruguay’s effort last week to make it appear that the agreement to set up the
GTAN exonerated it of its wrongful behaviour h as done nothing of the sort, although it does
89
CR 2009/19, p. 13, para. 4 (Condorelli).
90
Ibid., pp. 21-23, paras. 20-23.
91CR 2009/19, p. 18, para. 13; see also p. 19, para. 16 (Condorelli).
92RU, paras.2.121, 2.124, 3.109 and 3.112; 43 (Reichle r); CR2009/18, p.24, para.42 (Boyle); CR2009/16,
p.16, para.19 (Gianelli); CR2009/16, pp.42-43, para.14 (R eichler); CR2009/17, p.31; CR2009/19, p.21, para.19
(Condorelli). - 43 -
provide further proof that Uruguay’s attempt to show that the authorization issued on
15 February 2005 was not an authorization for construction is without basis.
Conclusions
44. And now I arrive at my conclusions. In the end, Members of the Court, Uruguay’s
strategy to justify its failure to fulfil its obligations under ChapterII of the Statute is reduced to
semantic quibbling that has no basis. If it were true that the Parties were in agreement on
constructing the mills, then why would they not have chosen to make use of the simplest and surest
means that they had readily available to them, that is, a decision by CARU? If, as
Professor McCaffrey said, “CARU is the Parties — Argentina and Uruguay — acting jointly” 93, or
94
“CARU is an instrument of the two Parties’ Foreign Ministries” , why then did they not use
CARU to put an end to the dispute over the pulp mills?
45. Mr. President, the reality is apparent. The fact is that Uruguay did not abide by Article 7.
The fact is that the purpose of the agreements of March2004 and May2005 was not to bypass
CARU or to exonerate Uruguay for its wrongful beha viour, or to give Argentina’s consent to the
construction of either of the pulp mills.
51 46. Mr.President, what is left once we have shown that the agreements of 2004 and 2005
were in no case aimed at bypassing CARU or to mo ving the Parties along to a subsequent stage in
the procedure provided for under the Statute? What is left is simply (and sadly) that Uruguay
breached the obligation to notify CARU in accord ance with Article7. And having done that,
Uruguay prevented the entire procedure under Chapter II of the Statute from going ahead. Thus, it
breached the provisions of that procedure as a whol e. Uruguay’s efforts to show that the Parties
had reached the stage of Article 8, or Article 9, or Article 11 or Article 12 make no sense, because
the Parties never got to the stage of Article 7, much less decide that it was not to be applied.
47. Mr. President, Members of the Court, it h as been a great privilege and honour to defend
my country’s rights, and to defend a model bilateral treaty concluded with our Uruguayan brethren.
93
CR 2009/18, p. 44, para. 27 (McCaffrey).
94
CR 2009/18, p. 45, para. 30 (McCaffrey). - 44 -
I would ask you now, Mr.President, to give the floor to my colleague and friend,
Professor Alain Pellet.
The VICE-PRESIDENT, Acting President: Thank you, ProfessorKohen. I now give the
floor to Professor Alain Pellet.
Mr. PELLET:
VII. R EPARATION AND BRIEF SUMMARY OF THE ARGENTINE ARGUMENT
1. Thank you very much. Mr. President, Members of the Court, I must first briefly revert to
the question of the reparation due to Argentin a from Uruguay as a result of its many, serious
breaches of the 1975 Statute. Then, more briefly still, I will resume our legal argument before the
Agent of the Argentine Republic makes some concl uding remarks prior to the reading of the final
submissions.
I. Reparation
95
2. Mr.President, comments made before this Court are never purely academic ⎯ even
52 when they are made by professors (a fraternity to which I am proud to belong . . .): they engage the
State on behalf of which they are made and it was with an advocate’s ear that, last Thursday, I
listened to the comments of my colleague and opp onent, yet also my friend, LuigiCondorelli.
Rather than following an “academic” plan à la française, I shall make a succession of remarks of
differing importance.
3. My first remark is a response to one of the preliminary arguments on which my opponent
relied, to the effect that Argentina appears to forget “that the Statute contains any number of
specific rules relating to the consequences of wrongful acts. Articles42 and 43 explicitly
contemplate compensation as an appropriate remedy in the event of harm caused by the pollution
96
of the river in breach of the Statute” . “In breach of the Statute”, these are the five words too
many, Mr.President: Article42 speaks of “responsabilité” in the French translation (“Cada parte
será responsable . . .” in the Spanish original) for the simple reason that neither the French nor the
95
CR 2009/19, p. 44, para. 1.
9Ibid., p. 46, para. 6 (Condorelli). - 45 -
Spanish permit a distinction to be drawn between the concepts rendered by the English words
responsible on the one hand and liable on the other. Those who translated the Statute into English
were not mistaken when they precisely rendered the idea underlying this provision by the phrase:
“Each party shall be liable to the other . . .”.
97
4. As Daniel Müller so clearly showed in the first round of oral pleadings , the purpose of
Articles 42 and 43 ⎯ which for the record are at tab 13 in the judges’ folder ⎯ is not to serve as a
response to a situation comparable to the one before us. It is not a question of compensating harm
resulting from the breach of the Statute by one of the Parties; moreover:
⎯ it is Article 43 and not Article 42 which refers to compensation;
⎯ this provision (Article 43; it is at tab 15) clearly concerns not relations between the two States,
but the consequences of the breaches committed by the users and falling within the respective
jurisdiction of the Parties;
53 ⎯ as for Article 42, it would be pointless 98 if it were to be interpreted as Uruguay suggests 99: “it
is a principle of international law, and even a general conception of law, that any breach of an
engagement involves an obligation to make reparation” (Factory at Chorzów, Merits, Judgment
No. 13, 1928, P.C.I.J., Series A, No. 17 , p. 29) and it would have been futile to mention this in
the Statute; on the other hand, saying that each of the Parties is liable vis-à-vis the other for the
harm resulting from the pollution caused by its activities or by those falling within its
jurisdiction, makes sense.
You will therefore be unable, Members of the C ourt, to follow my respected opponent when he
tries to convince you that this lex specialis, which he interprets wrongly, ought to prompt you to
disregard the fundamental principle of the law of international responsibility, according to which
restitutio in integrum is the basic remedy for the breach of an international obligation 100.
9CR 2009/15, pp. 41-42, paras. 14-16.
98
See Corfu Channel (United Kingdom v. Albania), Merits, Judgment, I.C.J. Reports 1949 , p.24; Territorial
Dispute (Libyan Arab Jamahiriya/C had), Judgment, I.C.J. Reports 1994 , p.23. See also the Arbitral Award of
17 July 1986, Filleting within the Gulf of Saint Lawrence, RIAA, Vol. XIX, p. 243, para. 30.
99
CR 2009/19, pp. 53-54, para. 22 (Condorelli).
10See, for example, MA, para. 8.218.27; RA, paras. 5.28-5.40; or CR 2009/15, pp. 45-46, paras. 4-6 (Pellet). - 46 -
5. Second, nor should any other argument, more over, prompt you, Members of the Court, to
disregard this basic form of reparation which is restitution. And assuredly not my opponent’s
assertion that a distinction should be drawn betwee n breaches of the procedural obligations on the
101
one hand, and the substantive ones on the other, which are laid down by the Statute . As we have
said and repeated 102, as LaurenceBoissondeChazournes and myself repeated yesterday, and as
PhilippeSands too pointed out a few moments ago, and indeed as the Court itself has
103
emphasized , these different types of obligations are linked. Not only by not complying with the
procedural provisions in Chapter2 has Uruguay prevented a dispassionate, ex ante assessment of
the potential risks of ENCE and Botnia to the ecosyst em of the river, but also and above all (where
reparation is concerned) by authorizing the c onstruction then the commissioning of Botnia, it
breached both the substantive and procedural provisions of the Statute. The plant was constructed
despite the requirements of Chapter2 and it is polluting; and it is going to pollute more if it
54 continues to operate ⎯ whereas the assessment of these risks in accordance with the Statute would
inevitably have meant that it was constructed elsewhere. For the purposes of reparation, no
distinction can be drawn between the two categories of provisions breached: the present injurious
situation is the result of the breaches of both of them.
104
6. Of course, Mr.President, reparation must be in “an adequate form” and “correspond[]
to the injury” 105, but it is the overall harm suffered by the victim St ate which must be considered:
whether it results from a single breach or, as in the present case, from a combination of several
breaches, be they of the same or different kinds , does not matter. The principle remains that
reparation must be total and that restitutio is the usual form of it. A form which only two reasons
106
might prompt one to disregard ⎯ and on this the Parties agree : material impossibility (Uruguay
101
See CR 2009/19, pp. 46-57, para. 7, or p. 52, para. 20.
10RA, paras. 1.19-1.45 and para. 5.40; CR 2009/12, p. 66, para. 9 (Boisson de Chazournes).
10Pulp Mills on the River Uruguay (Argentina v.Uruguay), Provisional Measures, Order of 13 July 2006, I.C.J.
Reports 2006, pp. 133-134, para. 81.
10See CR2009/19, pp.46-47, para.7 (Condorelli quoting Factory at Chorzów, Jurisdiction, Judgment No.8,
1927, P.C.I.J., Series A, No. 9, p. 21).
10Ibid., (Condorelli quoting Avena and Other Mexican Nationals (Mexico v. United States of America),
Judgment, I.C.J. Reports 2004, p. 59, para. 119).
10See, for example, CR 2009/15, pp. 45-46, para. 6 (Pellet) and CR 2009/19, p. 50, para. 16 (Condorelli). - 47 -
does not rely on it ⎯ and rightly so) or the fact that restitutio in integrum would be “out of all
107
proportion to the benefit deriving from restitution instead of compensation” .
7. Now, and this is my third remark, cont rary to what my spirited opponent has argued 108,
the cessation of the plant’s activities, whether through dismantling, relocation or conversion (or a
109
combination of all of them) would in no way be “fundamentally unacceptable” , “wholly
disproportionate” 110, “excessive” and “exorbitant” 111. To begin with, it seems to me important to
dispel the impressions which the photographs of th e plant shown by Argentina may have left you
with, Members of the Court: yes, Botnia is a ve ry large plant but, as in many modern industrial
55 complexes, the fixed installations ⎯ buildings, central chimney ⎯, impressive as they may be, are
perhaps ultimately less costly than the mobile equipment ⎯ machines, products, IT equipment ⎯
which can safely be used elsewhere. Just to gi ve one example: the Austrian company Andritz
signed a contract with Botnia for some 200 million euros, almost 300 million dollars, for supplying
fibre processing equipment 11; these are moveable goods which can be reused in another plant
built elsewhere. Furthermore, I maintain that the gross non-disproportionality, which constitutes
the only limit on the preference which should be given to restitutio in integrum over any other form
of reparation, must be assessed not on the date on which the Court will rule, but on that on which,
duly apprised of the risk it was taking, Uruguay took responsibility for disregarding Argentina’s
opposition to the construction of Botnia, notwithstan ding the firm warning addressed to it in your
Order of 13 July 2006 113. It then undertook to comply with an order for dismantling or cessation of
114
operation ⎯ and this undertaking probably played a role in your decision not to give effect to
the provisional measures requested by Argentina; in good faith, Uruguay cannot now go back on
its word and blackmail the Court (and the Applicant) with the “colossal damage” 115.
107ILC Articles on the Responsibility of States for Internationally Wrongful Acts, Art. 35 (b).
108
CR 2009/19, pp. 49-51, paras. 10-18, and pp. 54-56, paras. 26-29 (Condorelli).
109
Ibid., p. 49, para. 10.
110
Ibid., p. 50, para. 15.
111Ibid., p. 54, para. 26.
112See http://www.botnia.com/en/default.asp?path=204;1490;1491;1541;1544;917.
113Pulp Mills on the River Uruguay (Argentina v. Uruguay), Provisional Measures, Order of 13July 2006,
I.C.J. Reports 2006, p. 133, para. 78.
114See ibid., p. 125, para. 47.
115
See CR 2009/19, p. 47, para. 8 (Condorelli). - 48 -
8. Moreover, the resulting burden is not “colossal”: the plant can be relocated to a site less
harmful to the river and to Argentina; many elem ents in the present buildings can be reused; the
social drawbacks for the population of Fray Bentos will be minimal and offset by substantial
benefits since, as I said in the first round without being contradicted 116, the plant has more than
limited social repercussions in the region ⎯ and will have them just as much in the site to which it
would be relocated. And it can be. It is not gro ssly disproportionate; it is not unreasonable and it
is not unfair: such relocation will not prejudice Uruguay’s sustainable development ⎯ to which
56 Uruguay is legitimately attached ⎯ and will preserve Argentina’s sustainable development, for
117
which the operation of the plant on its present site shows sovereign contempt !
9. Mr. President, my fourth and last remark on the subject of the reparation due to Argentina
relates to both the cessation of Uruguay’s wrongful conduct and the guarantees of non-repetition.
But let me make one thing clear first: if I do not dwell on our other claims, this does not mean that
we renounce them, be they satisfaction in the form of a finding by the Court of the wrongfulness of
Uruguay’s conduct in authorizing the ENCE plant or be they the compensation which must be paid
by Uruguay for the harm suffered by Argentina until such time as Botnia has ceased to operate.
10. Having said this, which in no way implies that we renounce restitutio of course, we take
good note, Mr.President, that Uruguay, through the mouth of its advocate (professor or no...),
Mr.Condorelli, recognizes that, if the Court finds that it has committed wrongful acts “it would
then undeniably have to cease that conduct and return to compliance with the rules
118
breached . . .) . We also note that it accepts that
“such an obligation of cessation might very well mean that Uruguay must adopt new
measures with a view, for example, to better prevention of pollution. Uruguay in no
way disputes the power of your Court, if need be, to order the implementation of
measures of that kind as an element of the cessation, in the unlikely event that 119were
to find that the Respondent’s conduct has not complied with the Statute.”
And yet, this half-admission and these declarations of intent do not completely reassure the
Argentine Republic. If only because they are wholly sincere, it is hard to see why the Respondent
116CR 2009/15, para. 17; see also CR 2009/13, p. 23, para. 32 (Kohen).
117
Cf. CR 2009/19, p. 51, para. 18.
118
Ibid., p. 45, para. 3.
119Ibid., p. 45, para. 4. - 49 -
120
refuses to accept that the operative paragraph in the judgment should “state . . . explicitly” that it
must cease its internationally wrongful acts.
11. In the same spirit, it is precisely because, as ProfessorCondorelli again says, “Uruguay
57 has over and over again demonstrated its firm intent ion to continue to comply with its procedural
121
and substantive obligations under the Statute” and because these assurances have not always
been followed up that, in Argen tina’s view, the circumstances fu lly justify the Court upholding its
claim and ordering Uruguay to give the guarantees of non-repetition required, guarantees for which
122
monitoring the river cannot be a substitute ⎯ if only because it clearly has no purpose (in the
form suggested by Uruguay) if Botnia ceases operations on its present site ⎯ which the Court, as I
have said, is sure to order.
12. Lastly, Mr.President, to ensure that no ambiguity remains, I would add that Argentina
123
maintains its firm opposition to Uruguay’s claim for a declaration by the Court authorizing it to
continue operation of the Botnia plant: this is a disguised counter-claim, inadmissible under
Article 80 of the Rules of Court ⎯ a sort of back-to-front satisfaction ⎯; and this claim is in any
event completely baseless because Uruguay does not accuse Argentina of any breach of the
1975 Statute.
II. Brief resumé of the Argentine Republic’s argument
13. Mr. President, it remains for me to briefly recapitulate the main thrusts of the Argentine
Republic’s legal argument. At the end of two rounds of oral pleadings, during which Argentina has
had ample opportunity to state its views, this ma y strike you as somewhat excessive, Members of
the Court: you have listened to us with attention; you have noted or “registered” what seemed
important to us ⎯ or which was not so in your eyes; and you are perhaps starting to find the whole
thing rather protracted. I well understand you . . . And yet, I would ask you to grant me just a few
minutes more of your attention for, as is only natu ral, it is the Respondent who is going to have the
12Ibid., p. 45, para. 3.
121
Ibid,p. 58, para. 35.
12See CR 2009/15, pp. 37-43 (Müller).
12See ibid., pp. 55-56, paras. 26-28 (Pellet). - 50 -
last word; but we would venture to ask you to listen to its learned and astute counsel while what
seem to us the most important aspects of our positions are still very present in your minds.
14. To avoid any ambiguity, I shall present them, Mr.President, by stating what our
argument is not, by contrast with what it is:
58 ⎯ first, we do not say that, under the terms of th e 1975 Statute, the Party which considers that a
work or use of the waters of the river could affect its régime or the quality of its waters or
cause it ⎯ that Party ⎯ significant harm, has a right to veto or block the project ⎯ but we do
assert that that Party’s opposition can only be disr egarded by a decision of this Court on the
basis of Article12 of the Statute and that, by authorizing the ENCE project and the
construction and commissioning of the Botnia plant, Uruguay has committed a flagrant breach
of the balanced and reasonable system put in pl ace by the Statute; had that procedure been
complied with, at least some of the problems which it falls to you to solve would (and should)
have been submitted to you much earlier (whi ch, moreover, would have prevented the other
ones from arising);
⎯ second, we do not claim that it is not for the C ourt, in the context of the present case, to
determine whether the Botnia plant may cause si gnificant harm to Argentina or affect the
régime of the river or the quality of its waters ⎯ but we are firmly convinced that the
jurisdiction of the Court goes very far beyond such a determination and that it would be absurd
to stop at this, since the plant has been cons tructed and is operating in breach of numerous
provisions ⎯ not just procedural ones ⎯ of the Statute;
⎯ third, we do not allege that CARU has any deci sion-making power in this area or that it is
anything other than an instrument at the servi ce of its members (rem embering, however, that
there are two of them and that neither may impose its will on the other) ⎯ but we consider
that, in accordance with the text and spirit of the Statute, the Commission much summarily
determine the risks engendered by a project and that it constitutes the framework through
which communications and notifications between th e Parties must pass and that it is in that
body (CARU) that the matters dividing the Parties must be dealt with;
⎯ fourth, we do not consider that Article12 has no role to play in the present case ⎯ but we
contend that it does not constitute the basis of the jurisdiction of the Court, which was seised - 51 -
on the basis of Article 60, a provision which gives you jurisdiction, Members of the Court, to
consider all the breaches committed by Uruguay (i ncluding, by its conduct, having prevented
the Court from performing its role ex ante under Article 12;
59 ⎯ Fifth, we do not say that the 1975 Statute is a sacrosanct, immutable instrument, which may be
derogated from by an agreement between the Parties ⎯but we do consider that such a
derogation can only be made by means of an unambiguous formal agreement and, in any event,
we have established that no such agreement ⎯ nor, moreover, any informal arrangement ⎯
has ever been concluded with a view to setti ng aside CARU’s intervention, or, still less, for
authorizing the construction of the ENCE plant, even less so Botnia; the latter cannot have
been the subject of an agreem ent even before it was the subj ect of discussions between the
Parties;
⎯ Sixth, we do not say that Uruguay does not have the right to promote on its territory the
pulp-making industry in the context of its right to sustainable development ⎯ but we do
consider that it cannot do so by unilaterally us ing the shared resource of the River Uruguay,
disregarding the equally certain right of Argen tina and its population to its own sustainable
development, and we would assert that only the management of the River Uruguay with a view
to its optimum and rational utilization as organized by the Statute will achieve this balance;
⎯ Seventh, we do not say that the Botnia plant is , in itself and in the abstract, an ecological
monstrosity and we recognize that a pulp m ill inevitably has harmful effects on the
environment ⎯ but apart from the fact, as we have shown, that it is far, very far, from
presenting all the virtues which Uruguay ascribes to it , we contend more than ever that it is the
wrong plant in the wrong place, bearing in mind the vulnerability of the ecosystem of this
international watercourse and the previous uses to which it was subject ⎯ which also means
that we do not dispute that it ⎯ this plant ⎯ could legitimately (and lawfully) be relocated in a
place where the vast quantities of effluent which it discharges will be satisfactorily dispersed;
⎯ Eighth, we do not deny that the preliminary studies were backed by the (purely financial)
organization, the IFC ⎯ but we have shown that that organization based itself on reports which
are anything but exemplary as regards the indepe ndence of their authors, contrary to what
Uruguay proclaims from the rooftops, and which, in any event, are biased as a result of the - 52 -
methodological errors and the inadequacy of the data on which they are based and on
60 environmental impact studies which do not meet the requirements of contemporary
international law;
⎯ Ninth, please rest assured ⎯ this is my last point ⎯ that we are not claiming that an ecological
disaster has already occurred through the ope ration of Botnia, although serious harm has
already been caused to the river and significant harm to Argentina ⎯ but we have
demonstrated that the plant was set up with no consideration for the principles of prevention
and precaution, that it constitutes a clear and present danger to the environment and that, for
the future, it presents serious risks to the equilibrium of the river’s ecosystem; as we have
established ⎯ backed up by current evidence, and not based on reports prepared ex ante on the
basis of incomplete data ⎯ major pollution has already been detected and certain limits laid
down by the CARU standards and other applicab le standards have been exceeded, for example
as regards the dissolution of oxygen or the presence of toxic nonylphenols.
15. Mr.President, a ruling of the Court in favour of the argument which Uruguay has
presented to you would mean:
(1) that a State ⎯ a riparian State ⎯ of an international river may use and pollute it as it chooses
since the activities concerned are situated on its ow n bank or on its side of the thalweg or the
navigable channel, and even though this wate rcourse is supposedly the object of a treaty
making it subject to detailed, reasonable rules of joint management; it would also mean,
(2) that the world Court would be prepared to legitimize the unilateral proclamations of a sovereign
right to development which would be neither su stainable (because supremely indifferent to the
protection of the environment), nor in compliance with the very purpose of the 1975Statute,
which organizes the exercise of this right in the interest of the two States Parties by promoting
“the optimum and rational utilization of the river”; and
(3) it would also mean, in a word, that pacta non sunt servanda, since a party would only have to
declare, that “in its opinion” it is fully within its rights, even though a treaty requires it to
engage in extensive and organized consultation with its partner and lays down that, in the
absence of agreement, the parties must refer the matter to the Court, not ex post, but ex ante,
before having performed an act which one of them presents as irreversible. - 53 -
61 16. Mr. President, I hesitate to read out again the famous dictum from your 1996Opinion.
124
But Uruguay has made no bones about appropriating it to itself most unfairly , whereas its entire
attitude belies its proclaimed attachment to the principles which you so felicitously expressed. By
quoting it again, I would like to confirm that this crystal clear dictum very faithfully expresses the
principles from which Argentina has drawn inspirati on throughout this case: “the environment is
not an abstraction but represents the living space, th e quality of life and the very health of human
beings, including generations unborn” 125 (Legality of the Threat or Use of Nuclear Weapons,
Advisory Opinion, I.C.J. Reports 1996 (I ), pp.241-242, para.29 ). I will spare you the end of the
quotation but I should like to say that these truths today have the value of general principles
applicable even without any text; this is true a fortiori also when they are reflected in a treaty text.
17. Although it was concluded some 35 years ago, the Statute of the River Uruguay broadly
anticipated this outcome and organized the protec tion of the shared resource constituted by this
watercourse, by laying down the rules for its jo int management which the Eastern Republic of
Uruguay has flouted. It is this unlawful conduct, with grave repercussions, both concrete and in
terms of principles, which the Argentine Republic asks you to sanction by finding that the
Respondent has responsibility and by drawing the legal conclusions therefrom as regards
reparation.
18. Mr. President, Members of the Court, I hope I have not abused your attention, for which
I am most grateful. May I now ask you, Mr. President, to give the floor to
Ambassador Susana Ruiz Cerutti.
The VICE-PRESIDENT, Acting President: Thank you, Professor Pellet. I give the floor to
Ambassador Ruiz Cerutti for the concluding rema rks and final submissions of the Argentine
Republic. You have the floor, Madam.
12See CR 2009/17, p. 50, para . 10 (McCaffrey) and CR 2009/18, p. 20, para. 27 (Boyle).
12See also Gab číkovo-Nagymaros project (Hungary/Slov akia), Judgment, I.C.J. Reports1997,p.41, and
pp. 67-68, paras. 53 and 112; Pulp Mills on the River Uruguay (Argentina v. Uruguay), Provisional Measures, Order of
13 July 2006, I.C.J. Reports 2006, p.132, para.72; or PCA, ArbitrAward of 24 May 2005, para. 59 (available at
http://ww.pca-cpa.org/upload/files/Iron_Rhine_award.pdf (unofficial translation)); see also RIAA, vol. XVIII, p. 66-67. - 54 -
62 Ms RUIZ CERUTTI: Thank you.
S UBMISSIONS
1. Mr.President, Members of the Court, Argentina’s counsel and advocates have presented
to you our case and the factual and legal argume nts proving it and ProfessorPellet has just
summarized them. It is now for me to make sever al concluding remarks, if I may continue in the
same vein as my friend Professor Pellet.
2. As we have already explained, Uruguay has sought to restate the case submitted to you by
Argentina so as to have that case respond to Uruguay’s own case ⎯ one very different from ours.
But, Mr. President, it is for the Applicant to state its case, and for the Respondent to answer it.
3. Members of the Court, the case Argentina has submitted to the Court is not a case about
the sustainable development of Uruguay. Argentina has never questioned the right its neighbour
enjoys (just as our country does) to sustainabl e economic development. The case before you does
not concern that issue.
4. Nor does it concern industrial activity occurring on the Argentine bank, the site of small
and medium-sized businesses whose size and activity are in no way comparable to Botnia’s.
Uruguay has never contended that Article 27 of the Statute applies to these undertakings.
5. Nor is this a case against a private comp any, Botnia, or against the whole paper pulp
industry. And our case is not an industrial engineering competition to identify the best pulp mill.
6. Nor is the case before the Court directed at the International Finance Corporation, which
chose to finance the Botnia mill project. Ever since the inception of the IFC process, Argentina has
kept the organization apprised of the existence of a dispute over the project and has made its
position known. Argentina very much deplores the decision taken by the IFC in November2006
on the basis of biased documents. But the IFC is not a party to this case. The information and
reports prepared solely for the purposes of fi nancing the Botnia plant, which are moreover
63 inadequate and based on data gathered and prod uced largely by the company itself, were not
intended for use in proving the m ill’s compliance with the requirements of the 1975 Statute. They
carry no particular probative weight in our case and in no way excuse Uruguay from satisfying its
obligations under the 1975 Statute. - 55 -
7. Nor does the case Argentina has referred to you concern or put at issue the bilateral
relations between our two countries; I shall return to this point shortly.
8. The case Argentina has submitted to the Court is none of that.
*
9. Our case concerns a treaty ⎯ the Statute of the River Uruguay ⎯, violations of it and the
ensuing responsibility.
10. Our case concerns compliance with this special and specific conventional instrument,
aimed at ensuring to the two riparian States optimum and rational utilization of the River Uruguay
and economic development, while preventing an y pollution and any change in the ecological
balance of the river and its ecosystem. Our case is about use of joint machinery whose purpose is
to allow for joint management of the river to prevent and avert any problems of pollution. Our case
concerns Uruguay’s violations of its obligations to notify CARU, and to notify its neighbour
through CARU, of an industrial project “liable to affect the régime of the river or the quality of its
waters”. It concerns the breach of the obliga tion to transmit the requisite information and to
consult. And this case is about the violation of the obligation to prevent any pollution of the river
and its ecosystem. This is a case concerning the whole instrument governing the river, not just one
of its provisions taken in isolation.
11. That is all that Argentina’s case is about, but it is about all of that.
*
12. Mr.President, Members of the Court, you have seen the advocates and counsel on the
other side of the aisle juggling with dates, di plomatic notes, CARU minutes alleged to form an
64 agreement between Argentina and Uruguay to dispense with the procedural provisions of the
Statute in reviewing the ENCE and Botnia projects. This is mere rhetoric cleverly contrived to
camouflage Uruguay’s unilateral decision to dispen se with the prior information and consultation
régime our two countries have followed together for so many years. - 56 -
13. After both the unilateral authorization to construct the ENCE mill in 2003 and the one
issued for Botnia in 2005, Argentina repeatedly tried to get Uruguay to comply with the Statute and
submit the projects to CARU for its review and analysis. Those efforts were fruitless.
14. It became clear by March 2005 that the new Uruguayan Government, which had come
out against the pulp mills during the election campaign, was unmistakably going to continue its
predecessor’s unilateralist policy.
15. From that time on, the Argentine Governme nt took further steps in an effort to resolve
the dispute. In that connection it asked that the mills be relocated, that information be provided,
that work be halted and that a thorough assessm ent be made of the two mills’ impact on the
environment of the river. The Presidents of the two countries agreed to create a technical group ⎯
GTAN ⎯ in a further attempt to find a solution to the dispute, in particular the question of the
location of the mills, as ProfessorsPellet and Kohe n have already explained. Uruguay never had
any desire to discuss these questions, which in its view were matters lying wholly within its
sovereignty and were not, again according to Uruguay, subject to compliance with the
1975 Statute. Its responses were negative and caused GTAN to fail.
16. Despite the realization that the only way to a solution to the dispute was through
reference to the Court in accordance with Article 60 of the Statute, Argentina continued to seek to
resolve the matter through diplomacy. In March 2006 Botnia’s refusal to suspend construction
work prevented the signing of a very promising dr aft agreement that had been negotiated at the
highest level. Even after the Application instituting proceedings had been filed and the
proceedings before the Court were fully un der way, a procedure for facilitation by
H.M.theKingof Spain and the Spanish Govern ment was set up on Argentina’s initiative, but
Uruguay put an end to these negotiations as well in November2007 by authorizing the Botnia
plant’s commissioning.
65 17. Mr. President, Uruguay pursued a single objective: the fastest possible construction and
commissioning of the mills in an effort to pl ace Argentina (and then the Court) before a fait
accompli.
18. Uruguay now accuses Argentina of unwillingness to co-operate within CARU to monitor
the Botnia plant. But Uruguay cannot pick only what suits it. It cannot reject any role for CARU - 57 -
in respect of the mill projects and, at the same time, demand co-operation by CARU in ensuring
joint monitoring of the ecological damage one of its plants, Botnia, is now causing. This is
unacceptable. Argentina refuses to allow its role under the Statute to be reduced to that ⎯ to no
more than ex post monitoring.
19. This unilateralist policy is disastrous for an international river like the Uruguay. Our
opponents would appear to forget that this is precisely a shared resource subject to a special legal
régime. This is not the Thames, or the Seine, or the Mississippi. If the skewed interpretation of the
1975 Statute advocated by Uruguay since 2003 were the right one, if either riparian State were
entitled unilaterally to authorize or build a work , any work it liked, which was subject to the
Statute, notwithstanding disapproval by the other, then, Mr.President, the situation would not be
one of co-operation and optimum and rational utiliza tion: it would quite simply be anarchy, the
end of the Statute of the River Uruguay.
*
20. Members of the Court, as Argentina has shown, today we are far removed from assessing
a mere risk to the environment of the river. We have shown, in Professor Boisson de Chazournes’s
statements, that the impact assessments were glaringly inadequate. We have proved that the mill
has already caused significant damage to its environm ent, to the quality of its waters, to its flora
and fauna. You have read the reports and h eard the statements by ProfessorsColombo and
Wheater. Professor Sands has explained how Uruguay has elected to ignore the problem of reverse
66 flow in the River Uruguay. We have demonstrated that the Botnia plant violates the water quality
standards set within CARU. The Botnia mill uses and discharges substances which are toxic to the
environment. Our evidence clearly shows this.
21. Argentina has gone to great effort to put in place a transparent system that is as
comprehensive as possible for monitoring the river, the waters and air, the flora and fauna. It
proposed such a programme within CARU in Augus t2006. Uruguay declined to approve such a
programme within the Commission owing to its ove r-narrow interpretation of the scope of the
Statute, which does not confine itself exclusively to the waters of the river. The report drawn up by - 58 -
Argentina’s experts and submitted to the Court on 30 June is based on monitoring of the air, water,
sediments, flora and fauna, on a great number of samples and on data in the thousands ⎯ in short,
on high-quality, state-of-the-art scientific work. Argentina’s experts did not simply place their trust
in data and samples collected by others ⎯ and certainly not by Botnia ⎯ as is the case with many
of the purportedly “independent” reports relied on by the other Party.
22. The results Argentina has obtained, notw ithstanding the difficulties it had to overcome,
126
have already shown that the mill is not the “superb facility” described by Uruguay last week.
The alterations caused to the environment of the river are real; they violate the CARU standards
and constitute significant damage to the river and to Argentina in violation of the Statute.
Members of the Court, all of these things have happened at a time when the plant has only been
operating for slightly less than two years. Can you imagine the future damage to be incurred in the
ten, 20 or 40 years of the mill’s useful life? And afterwards . . .?
23. Members of the Court, Argentina is se eking confirmation and protection of the joint
mechanism which it has established, together with its neighbour, in the Statute of the River
Uruguay and which is also found in the Treaty of th e Rio de la Plata. These two rivers form the
natural boundary between our two countries and, at the same time, the link between them. To
uphold the unilateralist policy would be to deal a mortal blow to this prescriptive structure carefully
67 built up over more than 35years and which is based on prior co-operation, information and
consultation.
24. Mr. President, Members of the Court, the friendship between our two countries is not at
stake. Happily, bilateral relations are in very good sh ape; they are very rich. I shall cite just three
examples: commercial relations are excellent; Argentina is the second biggest supplier to the
Uruguayan market and the second biggest market fo r Uruguay’s exports. As for tourism, 2 million
tourists visited Uruguay in 2008, 53percent of th em Argentines. In January2009, that figure
increased to 73percent. In respect of renewable energy ⎯ to give a third example ⎯ the two
countries are in the process of setting up a bi-nati onal project in Uruguay for a major regasification
facility. This project represents a bigger investment than that in Botnia.
126
CR 2009/17, p. 45, para. 55 (McCubbin). - 59 -
25. It is only at the local level that the dispute has given rise to tension. It has
divided what
was the riparian community once formed by Gual eguaychú in Argentina and Fray Bentos in
Uruguay. For six years now, the inhabitants of Gualeguaychú have had pulp mill projects imposed
on them without consultation. They are already suffering consequences of the Botnia mill’s
presence; they are fearful and worried for their h ealth at the thought of having to put up with
40 years of foul odours, 40 years of acid rain, 40 years of toxic algae. The reaction referred to last
127
week by Uruguay , which Argentina in no way incited, is merely the consequence of building the
plant on the left bank of the River Uruguay opposite the city of Gualeguaychú and Ñyandubaysal.
Your task is not to pass judgment on the inhabitants of this city; and it is clear that the case
submitted to you in no way concerns road traffic between Argentina and Uruguay. It does concern
the 1975 Statute and the requisite compliance with its provisions.
26. To go by certain comments recently heard, it was an inimical act, as it were, on the part
of Argentina to seise the Court. This was not Arge ntina’s intention, nor that of the two Parties,
who, acting in the spirit of co-operation, chose the Court as the forum to adjudicate in the last resort
68 any disagreements between them concerning application of the Treaty of the Rio de la Plata and the
Statute of the River Uruguay. This choice shows that the two countries place their trust in the
international law of which the Court is the organ. Argentina has confirmed this trust by submitting
its dispute with Uruguay to you.
27. Mr. President, Members of the Court, Argentina and Uruguay agreed to adopt the Statute
and undertook to prevent pollution of the river and to avoid any change in its ecological balance.
The Parties created machinery for the implementation of these obligations and entrusted the Court
with the role of ensuring fulfillment of them. That is what is at stake in our case. Argentina has no
objection on principle to pulp mills generally. Our objections concern this mill ⎯ Botnia ⎯ at this
location ⎯ the sensitive environment of the shared resource, the River Uruguay. This is the wrong
mill at the wrong spot.
*
127
CR 2009/16, pp. 16-18, paras. 20-22 (Gianelli); CR 2009/19, pp. 42-43, paras. 24-25 (Reichler). - 60 -
28. Before reading the submissions of the Arge ntine Republic, I should like, on behalf of the
Agents and the entire team, to thank you, Mr.President, Members of the Court, for the attention,
patience and courtesy you have shown during these three weeks of hearings. Our thanks also go to
the Registry for its invaluable assistance to us in this case and for the smooth conduct of the
hearings. I should further like to express our gratitude to the excellent interpreters, whose work has
been outstanding. My thanks also go to counsel and all the members of Argentina’s team and to all
those who have assisted in their work.
29. Mr. President, Members of the Court, in accordance with Article 60, paragraph 2, of the
Rules of Court, I shall now read the final submissions of the Argentine Republic.
For all the reasons described in its Memorial, in its Reply and in the oral proceedings, which
it fully stands by, the Argentine Republic requests the International Court of Justice:
1. to find that by authorizing
69 ⎯ the construction of the ENCE mill;
⎯ the construction and commissioning of the Botnia mill and its associated facilities on the left
bank of the River Uruguay,
the Eastern Republic of Uruguay has violated the obligations incumbent on it under the Statute
of the River Uruguay of 26 February 1975 and has engaged its international responsibility;
2. to adjudge and declare that, as a result, the Eastern Republic of Uruguay must:
(i) resume strict compliance with its obliga tions under the Statute of the River Uruguay of
1975;
(ii)cease immediately the internationally wrongful acts by which it has engaged its
responsibility;
(iii)re-establish on the ground and in legal terms the situation that existed before these
internationally wrongful acts were committed;
(iv)pay compensation to the Argentine Republic for the damage caused by these
internationally wrongful acts that would not be remedied by that situation being restored,
of an amount to be determined by the Court at a subsequent stage of these proceedings; - 61 -
(v) provide adequate guarantees that it will refrain in future from preventing the Statute of the
River Uruguay of 1975 from being applied, in particular the consultation procedure
established by Chapter II of that Treaty.
30. Mr.President, Members of the Court, this marks the end of Argentina’s presentation.
Thank you very much.
The VICE-PRESIDENT, Acting President: Thank you very much, MsRuizCerutti. The
Court takes note of the final submissions which you have just read on behalf of the Argentine
Republic. Before closing this sitting, I would like to give the floor to Judge Bennouna, who wishes
to put a question to one of the Parties. Judge Bennouna, if you please.
Judge BENNOUNA: Thank you, Mr.President. My question, to Uruguay, is as follows:
What process and what products are used by Botnia plant for its cleaning?
70 En français, ma question qui s’adresse à l’Ur uguay est la suivante: Quel procédé et quel
produit sont utilisés par l’usine Botnia pour son nettoyage ?
Thank you, Mr. President.
TIheE-PRESI DENT, Acting President: Thank you, Judge Bennouna. The text of this
question will be communicated in writing to the Pa rties as soon as possible. The Eastern Republic
of Uruguay, to which JudgeBennouna’s question is directed, is requested to provide its written
response by a time-limit set at Friday 9 October 2009 at 6 p.m. In addition, any written comments
the Argentine Republic may wish to make upon th e other Party’s response, in accordance with
Article 72 of the Rules of Court, must be communicated by Monday 19 October 2009 at 6 p.m.
May I remind you that the Eastern Republic of Uruguay will present its second round of oral
argument on Thursday 1October from 3p.m. to 6p.m. and on Friday 2October from 10a.m.
to 1 p.m.
The Court now rises.
The Court rose at 1 p.m.
___________
Translation